34
www.eta.co.at
Subject to change due to technical improvements
Attaching housing/panels Installation
Attach pellet bin housing
After completing the wiring, fit the pellet bin
housing into the slits in the boiler housing.
The bottom of the housing is flush with the exten-
sion frame.
Fit cover
Attach cover for heat exchanger cleaner
Fasten the cover for the heat exchanger cleaner
with 2 black self-tapping screws.
Insert rubber plugs into housing
Fasten rear panel
Fit the rear panel into the slits in the boiler housing
and fasten it with 4 round-headed screws.
Affix label with safety notices
to door of store
Affix the label with pellet store safety notices to
the pellet store's door.
Housing
Round-headed screws
Cover for heat exchanger cleaner
Cover
Rubber plugs
Attaching housing/panels
Prevent moisture from damaging pellets!
Danger! Moving parts may cause injuries!
Open door to pellet store, filling and
venting nozzles for minimum 60 minutes
ventilation prior to entering storeage area!
Ensure that the ETA pellet boiler is in
automatic mode while store is being filled!
Switch main power supply to OFF
before entering the pellet storage area!
Smoking, naked flame or any other
ignition sources are prohibited!
No entry for unauthorized personnel!
Area unsafe for children!
www.eta.co.at
Wood Pellets - Storage Room
Only enter the pellet storeage area while in
the presence of a second person!
The second person should remain outside
the storage area in case of help is needed!
Summary of Contents for PE-K 35
Page 17: ...17 PE K installation 35 to 90 kW 2012 02...
Page 25: ...25 PE K installation 35 to 90 kW 2012 02...
Page 37: ...37 PE K installation 35 to 90 kW 2012 02...
Page 56: ...56 www eta co at Subject to change due to technical improvements...
Page 57: ...57 PE K installation 35 to 90 kW 2012 02...
Page 58: ...58 www eta co at Subject to change due to technical improvements...