Flue Gas Recirculation

HACK 200 kW

Installation

Summary of Contents for HACK 200

Page 1: ...2015 02 06 EN 0000000135 V 002 X 29 0 93706 Flue Gas Recirculation HACK 200 kW Installation...

Page 2: ...ETA Heiztechnik Gewerbepark 1 A 4716 Hofkirchen an der Trattnach Tel 43 0 7734 22 88 0 Fax 43 0 7734 22 88 22 info eta co at www eta co at...

Page 3: ...djusting the gearbox motor 11 4 3 Installing the drive chain 12 4 4 Adjusting the shutoff device 14 4 5 Installing the flue gas pipe 14 5 Fuel change 16 5 1 Overview 16 5 2 Adjusting software paramete...

Page 4: ...Individual configurations depicted or described here are only optionally available In the event of contradictions between individual documents regarding delivery scope the information in our current...

Page 5: ...thus The combustion temperature increases significantly with these fuels resulting in an increased risk of slag formation and wear in the boiler Recirculating the flue gas from the boiler outlet back...

Page 6: ...6 www eta co at Overview 3 Overview 1 Flue gas pipe 2 Turbulator 3 Flue gas duct 4 Chain protector 5 Cover...

Page 7: ...re seal 5 M8 x 235 threaded rod 6 M8 x 30 hexagonal long nut 7 Flue gas duct 8 Fibre glass seal 9 Self locking M8 hexagonal nut 10 Hexagonal screw M8 x 35 11 Drive shaft stub 12 Guard plate 13 Rear si...

Page 8: ...8 www eta co at Overview Flue gas pipe 1 Hexagonal screw M5 x 16 2 Silicon foam seal 3 Insulation...

Page 9: ...annot be switched back on and verify that it is safely isolated from the power supply Preparations 1 Remove the precut recess on the back wall and cut out the insulation 2 Remove the cover behind the...

Page 10: ...Mount the flue gas duct on the boiler with four M8 x 30 hex long nuts The flue pipe opening is at the top 2 Glue the ceramic fibre seal to the flue gas duct flange 3 Screw the four M8 x 235 threaded...

Page 11: ...Adjusting the gearbox motor 1 Remove the guard plate from the drive motor by removing two M5 x 8 round head screws 2 Remove the M8 x 16 hex screw the washer the activation plate and the short spacer f...

Page 12: ...tighten the rear of the chain protector to the flange bearing with three M5 x 12 hex screws 2 Make sure you insert a key in the drive shaft stub Grease the drive shaft stub 3 Place the drive chain on...

Page 13: ...til the drive chain has lateral play of max 5 mm 7 Tighten the four M8 hex nuts on the threaded rods and check the chain tension again Mounting the cover 1 Place the chain protector on the rear side o...

Page 14: ...removing four M5 x 16 hex screws 2 Place the seal of the shutoff device on the flange Rotate the shutoff device and install it with four M5 x 16 hex screws 4 5 Installing the flue gas pipe 1 Thread th...

Page 15: ...the connection between the flue gas pipe and flue gas duct with heat resistant silicon 4 Mount the cover on the chain protector and boiler with seven M5 x 12 hex screws and washers 5 Place the insulat...

Page 16: ...16 www eta co at Overview Fuel change 5 Fuel change 5 1 Overview...

Page 17: ...kg 35 kg 18 kg 35 kg 10 kg De ash after max 230 kg 173 kg 155 kg 78 kg 155 kg 78 kg 155 kg 78 kg 155 kg 78 kg 80 kg 24 kg De ashing interval boiler without buffer storage tank Software parameters De a...

Page 18: ...f you know the water content and density of the fuel you are using you must also adjust these two parameters You can find them in the same submenu Changing the de ashing interval Open the settings by...

Page 19: ...e sensor is behind the front cover of the boiler Fig 5 1 Firebed level sensor The different positions for boilers with the stoker on the left side are described below For a boiler with the stoker on t...

Page 20: ...www eta co at...