Warranty, guarantee and liability
General
CAUTION!
On non-compliance with this safety instruction, there is
a risk of material damage.
WARNING!
On non-compliance with this safety instruction, there is
a risk of physical injury.
DANGER!
On non-compliance with this safety instruction, there is
a risk of major physical injury.
1.3
Warranty, guarantee and liability
Requirements
We can only accept liability for the function of our
products if they are correctly installed and operated.
This is only possible if the conditions below are
complied with.
Maximum of 2,000 hours at full load per year
The boiler described in this user manual may only be
used for heating and producing hot water, with no more
than 2,000 full-load hours annually.
Installation in a dry room
For set-up, a dry room is required. In particular, only
condensation dryers may be used as clothes dryers in
the same room.
Observe local building and fire safety regulations
Local building and fire safety regulations must be
observed.
Suitable fuels
•
Wood chips according EN ISO 17225-4:2014,
quality classes A1/A2/B1/B2, size P16S-P31S,
maximum water content 35% (M35)
•
Wood pellets according EN ISO 17225-2:2014,
quality class A1, ENplus-A1
•
Shavings and swarf briquets according EN
ISO 17225-3:2014, quality classes A1/A2/B
•
Miscanthus-wood chips according
ÖNORM C 4000 and C 4001
•
In germany: fuel classes 4/5a according
1. BImSchV. Use fuel classes 5/6/7/8 only after
consultation with company ETA.
Operation with unsuitable fuels, in particular high-
slag pellets from grain waste, for example, or
corrosive fuels such as miscanthus fertilised with
potassium chloride, is prohibited.
Ensure supply air is free from aggressive
substances
The air supplied to the boiler must be free from
aggressive substances such as chlorine and fluorine
from solvents, cleaning agents, adhesives and propel-
lants, or ammonia from cleaning agents, to prevent
corrosion of the boiler and chimney.
Permissible water hardness
Water is the intended heat-transfer medium. For
special anti-frost requirements, up to 30% glycol may
be added. Softened water is required for the initial fill-
up of the heating system and for refilling after repairs.
Addition of hard water should be minimised to limit
limescale build-up in the boiler.
In order to protect the boiler from calcification, the
water hardness of the heating water must be
taken into account. Observe the indications outlined in
ÖNORM H 5195-1. Details can be found in chapter
12
"Heating water"
.
pH value between 8 and 9
The pH value of water used to fill the heating system
must be between 8 and 9.
Use a sufficient number of shut-off valves
Set enough shut-off valves to avoid bleeding large
amounts of water during repairs. Any leaks in the
system must be repaired at once.
Install safety valve and thermal relief valve
A safety valve (triggered at 3 bar) as protection against
excess pressure and a thermal relief valve (triggered
at 97 °C) to protect against overheating must be
installed by the contractor.
Provide a sufficiently large expansion tank or a
pressure maintaining device
To prevent air from being drawn in while the system is
cooling, the heating system professional must provide
a sufficiently large expansion tank or a pressure
maintaining device.
Open expansion tanks must not be used.
Sufficient power
Operation at lower power than the lowest power
specified on the type plate is not permitted.
Summary of Contents for HACK 20
Page 1: ...2017 01 30 EN 0000000294 V 003 2 38 0 3005 3106 93526 001 Wood chip boiler 20 90 kW Operation ...
Page 15: ...Changing the fuel Settings 15 4 2 Settings ...
Page 35: ...ETAtouch controller Boiler function block HACK 35 ...
Page 45: ...ETAtouch controller Buffer function block 45 ...
Page 49: ...ETAtouch controller Hot water tank function block 49 ...
Page 53: ...ETAtouch controller Fresh water module function block 53 ...
Page 67: ...ETAtouch controller Solar function block 67 ...
Page 73: ...ETAtouch controller Heating pipeline function block 73 ...
Page 92: ...www eta co at www eta co at downloads DOWNLOAD ...