Cleaning and maintenance
Cleaning (customer)
21
Installing the maintenance cover
Reinstall the maintenance cover. Tighten the screws
evenly and cross-wise.
Fig. 2-30: Maintenance cover
Place the insulation over the maintenance cover again.
Fig. 2-31: Insulation
Mount panel on the top
Remount the panel on the top of the boiler again.
Fig. 2-32: Panel
2.5.6
Clean flue gas recirculator (optional)
Remove the panel on the top
Remove the panel on the top of the boiler.
Fig. 2-33: Panel
Check air valve for flue gas recirculation
Manually operate the air valve actuator and check its
freedom of movement.
Fig. 2-34: Actuator of flue gas recirculation
For manual operation, push the release button (red
button) and manually turn the actuator 90° with the set
screw.
Fig. 2-35: Manual operation of actuator
Summary of Contents for eHACK 20-50 kW
Page 7: ...Cleaning and maintenance Maintenance notes 7...
Page 74: ...www eta co at...
Page 75: ......
Page 76: ...www eta co at www eta co at downloads DOWNLOAD...