9
Once burner is firing check and if necessary adjust oil pressure. (see Technical Data).
Carry out combustion checks by inserting probe into sampling point provided at the flue box behind the
cast iron flue hood access door. (Fig. 8) The air setting is pre-set.
Check the smoke number and if necessary increase the air setting progressively until a number between
0 and 1 is achieved.
Note:
From cold and particularly on a new installation, there will be a condensation of the flue gases
and this may affect the paper
Allow boiler to heat up for a further 10 minutes then check smoke number, adjusting the air if necessary
(see Technical Data). Monitor the flue draught at the same point and check that a steady updraught is obtained.
Turn boiler thermostat to ‘O’. Isolate mains supply and remove the pressure gauge.
Cooker Burner (Right Hand Burner)
Connect combined air bleed manifold and pressure gauge to pump.
Re-establish electricity supply to the cooker.
Warning:
The cooker power is now live. Extreme caution must be exercised.
Check that any ancillary controls e.g. programmer etc are in an ON position.
Turn cooker thermostat to 250°C position. Burner should start ignition sequence.
(When the burner motor starts on a one pipe system it may be necessary to temporarily open the air bleed
screen on test manifold).
Once burner is firing check and if necessary adjust oil pressure (see Technical Data).
Carry out combustion checks by inserting probe into sampling point provided at the flue box. (Fig. 8)
The air setting is pre-set at minimum.
Check the smoke number and if necessary increase the air setting progressively until a number between
0 and 1 is achieved.
Note:
From cold and particularly on a new installation, there will be a condensation of the flue gases
and this may affect the paper.
Allow cooker to heat for a further 10 minutes then check smoke number, adjusting the air setting if
necessary (see Technical Data). Monitor the draught at the same point and check that a steady updraught
is obtained.
Turn cooker thermostat to OFF. Isolate mains supply, remove pressure gauge and replace the control panel.
To complete the commissioning process, you must fill in both of the following:
a) Commissioning Record - at the back of this booklet on p18
b) Commissioning Confirmation Form - a separate leaflet supplied with this cooker.
Important:
Failure to complete these documents will invalidate the warranty of this product.
8
Infil plate
Door pin
Control
panel
Upper
control
panel
securing
screw
Wiring panel securing
screws
WIRING PANEL
Lower control panel securing screw
AllAn
Screw
Oil Installation Schematic Diagram - Fig.3
vent
filler
drain valve
remote operated
fire valve
shut-off valve
oil tank
isolating valve
filter
cooker
10ft (3m) max head of oil
18” (475mm)
min head of oil
Removing the Wiring Panel - Fig.2b
Removing the Control Panel - Fig.2a