Celebrating over 30 years of excellence in manufacturing ultrasonic cleaning
equipment, electropolishing equipment and associated chemistries
ESMA, Inc.
P. O. BOX 734 * SOUTH HOLLAND, IL 60473 * (800)-276-2466 * FAX (708)331-8919
5
2. INSTALLATION
If the control module is to be placed directly in front of tank, allow 5 inches between counter opening and front of cabinet
(diagram 1). Also, 28 inches of clearance is necessary under the counter for drains.
Control Module
- Cut opening of 4 ¼” x 10 ¼” in front of cabinet. The overall flange of unit on front of cabinet is 5” x 12”,
so center unit accordingly. Module will be mounted later with 4, No. 8 wood screws.
Tank Cabinet -
Cut opening of 16” wide X 15” depth in top of counter. The overall flange of unit on top of counter is 18
¾” wide X 18” deep, so center the unit accordingly. Secure unit to counter with 8, #10 stainless wood screws supplied.
Tank Module
should be set in counter first. Place the tank-mounting screws into pre-drilled holes in counter and tighten
down with #8 flat head screws, which are supplied. (DO NOT OVERTIGHTEN).
Power Module
measures 8’ x 16” x 18”D. However, 1” of clearance is necessary both at the front and back of unit for
proper ventilation. The electrical connections, from tank and control modules, attached to the top of the module, require
additional 2 to 3 inches of space.
The Metering Pump
should be monitored to assure that there is solution in the jug. Due to the length of tubing, it will
take one cycle for the metering pump to become “primed”. Once the pump is primed, a 1% solution concentrate will
automatically be added to the water during the fill cycle. Please regularly check to make sure that there is adequate
cleaning solution in the jug.
3. PLUMBING HOOK-UP
A. Water Input
The primary solenoid should be connected to a hot water source.