
INSTALLATION
WALL DRILLING AND BRACKET FIXING
60
21
11
D
12
60
C
10
80
80
11
(3)
B
A
Vertical reference line
60
(1)
60
(2)
930-1030
20
As a first step,proceed with the following drawings:
Mark Points:
A veritcal line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
The cooker hood should be placed
650-750
mm ( horizontal line
A
) up from the cooking
plane for safe and a good effect.
A horizontal line
B
at a minimum
930-1030
mm above the cooker top.
A horizontal line
C
at a
132
mm above the
B
.
A horizontal line
D
at
448-783
mm above the cooker hood.
Mark a point
(1)
on the horizontal line
D
,
60
mm to the vertical reference line.
Repeat this operation on the other side, checking that the three marks are leveled.
Mark a point
(2)
on the horizontal line
C
,
60
mm to the vertical reference line.
Repeat this operation on the other side, checking that the three marks are leveled.
Mark a point
(3)
on the horizontal line
B
,
80
mm to the vertical reference line.
Repeat this operation on the other side, checking that the three marks are leveled.
2
3
4
5
6
7
8
9
10
11