background image

Installation instructions for spring loaded snap latch systeQ-4687

1. Preparation of door leaf

65mm min.

2. Fixing
self tapping screw

ST 4,2 x 13mm

DIN 7982

screw M5 x 12mm

DIN 965

riv nut M5

not included

3. Align axle of snap latch  

  perpendicularly above  

  axle of tapped hole  

  (active leaf lock)

6c. Assembly 

 

- drive in adaptor sleeve 

 

- turn shoot bolt out

7. Assembly and setting of snap latch 

 

1. Insert active leaf lock

Setting range

max. +2mm

8. Shim forend if there is more door  

 clearance

Attention:

Chamfer striking plate where  

latch bolt hits!

9. Align snap latch

10. Function test

If jammed see 

point 3 and 9

D

GB

I

F

adaptor sleeve 3 x 14

*

 

These lock do not correspond to EN 179 / 1125

Only use articles which are describe in these instructions.

These instructions and directions should be passed to the  

end user by the installer and keep reliably up to the working life.

Leaving technical details.

1. The leaves and the frame of the door element must be made of sufficiently sturdy 

materials (e.g. welded steel or aluminum profile). Make sure that any deformation in 

the door element is kept to a minimum to ensure that the locking element will work 

properly.

2. The leaf dimensions in the door elements produced may not exceed  

3500 mm in height, 1600 mm in width or 400 kg in weight.

3. Key-operated half- or double cylinders as well as 

mechanical or electronic knob cylinder (with or without 

key operation) have no effect on the lock’s panic door 

function (even when the key is inserted). Only the knob 

of a mechanical or electronic knob cylinder can affect 

the push bar’s functioning, depending on the knob shape 

and size. Some push bars pose the risk of pinch or shea-

ring points. That’s why it’s important to keep a clearance 

of at least 10mm between the outside of the knob up to 

the lever arm or other activating fitting.

4. Corresponding bolt length calculation for assembly of 

keeps and door selectors (Art. 9648). See instruction  

70 40 056.

http://www.esco-Zertifikate.de

performance description and 

certificates

esco 

Metallbausysteme GmbH 

Dieselstraße 2 

D-71254 Ditzingen

systeQ-S20*,

systeQ S20-ESC,

systeQ S20-SL-ESC

SysteQ-4687

SysteQ-9650

5. Assembly of 

snap latch

turn shoot 

bolt in

6a. Assembly 

 

- put on snap latch 

 

- drill through the hole

6b. Assembly 

 

- put in spring 

 

- put on snap latch  

 

  with spring

systeQ-S20-638z*

systeQ-S20-ESC-667z

systeQ-S20-ESC-668z

systeQ-S20-ESC-677z

systeQ-S20-ESC-678z

systeQ-S20-SL-ESC-767z

systeQ-S20-SL-ESC-768z

systeQ-S20-SL-ESC-777z

systeQ-S20-SL-ESC-778z

4a. 

Active leaf:

 

Determining the 

length (L) of the shoot bolt- cut shoot bolt 

Art. Nr.

Stulp 

285mm

systeQ-S20-638z*

systeQ-S20-ESC-667z

systeQ-S20-ESC-668z

systeQ-S20-ESC-677z

systeQ-S20-ESC-678z

systeQ-S20-SL-ESC-767z

systeQ-S20-SL-ESC-768z

systeQ-S20-SL-ESC-777z

systeQ-S20-SL-ESC-778z

L = Lo + 

25mm

systeQ-6672

285mm

systeQ-9648

L = Lo + 38mm

SL

Art.Nr.

systeQ-P676

systeQ-4687

systeQ-9648

Lo

4b. 

Inactive leaf:

  

Determining the length (L) of 
the shoot bolt- cut shoot bolt

 

Reviews: