
S Y S T E M O V E R V I E W
MyLab
- G E T T I N G S T A R T E D
3 - 8
Installing the Portable Configuration
Refer further in this chapter
for information on probe
connection.
Place the
MyLab
on the work surface using the handle as sloping support.
Position the equipment so that the power outlet is easily accessible. Connect
the power cable to the
MyLab
socket. Plug the cable to the reliable grounding
power outlet to assure adequate grounding.
NOTE
Whenever
MyLab
has to be insulated from the mains, disconnect the cable
from the power outlet.
Press the LCD's safety push-buttons to open the screen and rotate it into its
working position. Connect the probes and all accessories.
Accessories for Outdoor Transport
MyLab
and its AC/DC adapter can be housed on a shell body, that is equipped
with a rucksack and optional straps.
The instructions for the installation are provided with the house shell.
When
MyLab
is housed in the shell body can be installed on the fold-away
trolley. The configuration’s compact size and light weight make it possible to
move the
MyLab
very easily.
The instructions for the installation are provided with the fold-away trolley.
Summary of Contents for MyLabSigma elite
Page 1: ...Rev 05 June 2021 MyLabSigma elite GETTING STARTED 350061100...
Page 2: ...MyLab G E T T I N G S T A R T E D ii...
Page 5: ...MyLab G E T T I N G S T A R T E D v GETTING STARTED RED Declaration of Conformity...
Page 6: ...MyLab G E T T I N G S T A R T E D vi...
Page 12: ...I N D E X MyLab G E T T I N G S T A R T E D xii Standards 9 6...
Page 24: ...I N T R O D U C T I O N MyLab G E T T I N G S T A R T E D 1 12...
Page 120: ...P E R F O R M I N G A N E X A M MyLab G E T T I N G S T A R T E D 7 10...
Page 134: ...T E C H N I C A L S P E C I F I C A T I O N S MyLab G E T T I N G S T A R T E D 9 8...