ESAB GASARC GPE 400 Series Installation & Operating Instructions Manual Download Page 5

5

EN

Pressure Regulator

LAB11141_Issue 1

June 2019

5 INSTALLATION

5.1 

Position the gas cylinder/vessel in the desired location, ensuring it is secured correctly. Note, all gas cylinders should be vertically positioned or installed in 

line with the manufacturers/suppliers instructions.

5.2 

Before installing your pressure regulator ensure that it and the connection to the cylinder/system show no signs of damage or contamination, in particular 

the presence of oil or grease. Ensure your pressure regulator is in its fully closed position (pressure adjusting knob fully unwound anti-clockwise).

5.3 

Install the regulator by connecting the inlet connection to the cylinder/vessel/system in the appropriate manner using the correct torque settings as laid 

out in the applicable cylinder connection ‘Regional Standard’. Note, the direction of thread could be either left or right handed, normally indicated by a 

‘Notching’ applied to left hand threaded connections.

5.4 

If connecting a pipeline regulator to a piped system, install the regulator by applying the correct PTFE (Teflon) tape to the male connecting ¼ NPT thread. 

Please note that on stainless steel connections the thread tape helps prevent the connections from galling together when tightening or loosening.

5.5 

Start the PTFE tape on the second thread as shown below in 

figure 1

; making sure the tape does not overlap the end of the fitting. As the tape is wrapped 

in the direction of the thread spiral, pull tightly on the end of the tape so the tape conforms to the threads. Wrap the tape around the threads twice, cut off 

the excess tape and press the end firmly into the threads as shown in 

figure 1.

5.6 

Once the PTFE tape is applied and the mating female connection is ready for installation, screw the connections together (clockwise) until tight. Please note 

that ¼ NPT joint torque setting = 20 Nm (15 lbf-ft), however slight adjustment may be needed to ensure the regulator is in an up-right position

6 OPERATION

6.1 

After connecting your equipment to the inlet feed and before opening the cylinder/isolation valve, connect the appropriate downstream equipment, if 

applicable using the PTFE tape jointing guidance in 

section 5.4 and 5.5

.

6.2 

Ensuring that the pressure regulator is in the fully closed position (pressure adjusting knob fully unwound anti-clockwise), open the cylinder/isolation valve 

slowly allowing the gas to enter the high pressure chamber of the regulator, which will indicate on the cylinder content gauge if fitted.

6.3 

To pressurise your system or downstream equipment, gradually increase the outlet pressure by turning the pressure adjusting knob clockwise, increasing 

the outlet pressure of the regulator in small stages of around 1 – 2 bar, ensuring the integrity of the regulator valve seat is not compromised.

6.4 

When set at the desired pressure and the system is in a dynamic state (flowing), adjustments may be required to the operating pressure of the regulator to 

allow for pressure decay over large systems or peaks in flow demand.

7 DECOMMISION

7.1 

Firstly ensure there is adequate ventilation or the appropriate waste/vent facility. 

7.2 

Slowly close the cylinder/isolation valve feeding the regulator allowing the gas to purge through the regulator and out via the downstream equipment or 

system. Note, all fitted pressure gauges must read 

‘Zero’

 pressure before the regulator can be removed.

7.3 

If the gas is a corrosive, toxic or a pyrophoric gas, an inert purge gas may be required, fed in through the high pressure side of the regulator as detailed in 

the ‘Deep Purge Section’.

7.4 

When the regulator is de-pressurised and/or purged free of any hazardous gases, fully close the regulator (turn Pressure adjusting knob anti-clockwise) and 

remove from the cylinder/system.

7.5 

When a pressure regulator is removed from a cylinder, vessel or system, it should be stored in a dry safe location protected from contamination.

7.6 

Dispose in accordance with applicable International, Regional, Country, Federal State, County or City laws/regulations.

8 PURGING

Purging allows the user to maintain gas purity, reduce the risk of corrosion and dilute any moisture, impurities, toxic or pyrophoric gases trapped within equipment prior to 

use or decommissioning. This is achieved by fitting the appropriate waste/vent facility, or by installing a purge gas system fitted to the high pressure feed of any regulator or 

system. When installing equipment or a full system for the first time, a full system purge or vacuum is required to remove any moisture, impurities or contamination prior to 

use. Note, a downstream vent point will be needed to totally purge a fully installed system.

8.1 

Tee Purge: Installation

8.1.1  To install a ‘Tee Purge’ to a pressure regulator, it may be necessary to remove the regulators inlet connection. This is achieved by securing the regulator 

firmly in an appropriate manner (Gas-Arc Universal Cradle:

 Part No. TOL01938)

, and unscrewing (rotate anti-clockwise) the connection free from the body 

of the regulator (1/4 NPT joint).

8.1.2  When the connection is removed, clean the ¼ NPT male and female parts, ensuring existing PTFE tape is removed and they are free from contamination 

and/or damage.

8.1.3  Fit the inlet connection to the inlet of the ‘Tee Purge’ as shown below in 

figure 2

, using the PTFE jointing guidance detailed in

 section 5.4 and 5.5

 

(clockwise).

8.1.4  Again using the above PTFE jointing guidance given, fit the outlet of the ‘Tee Purge’ to the inlet of the regulator (clockwise).

8.2 

Tee Purge: Operation

When installed, the ‘Tee Purge’ facility allows the user to isolate the regulator or system and purge any air, moisture or impurities out of the high pressure feed without 

contaminating the regulator or process. The user must ensure that the waste/vent valve discharges via a piped or contained system into a well-ventilated area.

8.2.1  When fitting the regulator and ‘Tee Purge’ assembly to a cylinder/vessel/system use the instructions detailed in 

section 5.0

8.2.2  After the equipment is installed, but before opening the cylinder/isolation valve, ensure that both the high pressure isolation valve and the waste/vent valve 

are closed. Slowly open the cylinder/isolation valve allowing the high pressure gas to enter the ‘Tee Purge’ assembly.

8.2.3  To purge any contamination free from the equipment, open the waste/vent valve for around 3 – 5 seconds allowing the process gas to purge out any 

impurities. When purged, close the waste/vent valve and open the process valve allowing pure gas to enter the process line.

Figure 1

Summary of Contents for GASARC GPE 400 Series

Page 1: ...INSTALLATION OPERATING INSTRUCTIONS EN SICHERHEITS UND INSTALLATIONSANWEISUNGEN DE INSTALACI N EINSTRUCCIONES DE MANEJO SP INSTRU ES DE INSTALA O E OPERA O PT Pressure Regulator Druckminderer Regulado...

Page 2: ...ndbuch entstanden sind egal ob ein solcher Fehler nun durch Nachl ssigkeit Unfall oder eine andere Ursache entstanden ist Publicado por GASARC Queda prohibida la reproducci n total o parcial de este d...

Page 3: ...CT 4 2 USER RESPONSIBILITY 4 3 CUSTOMER SERVICE 4 4 GENERAL SAFETY INFORMATION 4 5 INSTALLATION 5 6 OPERATION 5 7 DECOMMISION 5 8 PURGING 5 8 1 Tee Purge Installation 5 8 2 Tee Purge Operation 5 8 3 D...

Page 4: ...vice facility designated by GASARC 3 CUSTOMER SERVICE In the event of equipment failure contact the GASARC customer services department Please be prepared to provide the model number of the equipment...

Page 5: ...valve feeding the regulator allowing the gas to purge through the regulator and out via the downstream equipment or system Note all fitted pressure gauges must read Zero pressure before the regulator...

Page 6: ...first close the inlet isolation valve then open the waste vent valve allowing the purge gas to escape Continue this process 5 8 times pulse purging the Deep Purge assembly 8 4 6 When complete ensure...

Page 7: ...STALLATION 9 6 INBETRIEBNAHME NUTZUNG 9 7 AUSSERBETRIEBNAHME 9 8 SP LEN 9 8 1 Hochdruck Prozessgasp lvorrichtung T Purge Installation 10 8 2 Hochdruck Prozessgasp lvorrichtung T Purge Bedienung 10 8 3...

Page 8: ...r GASARC benannt wurde entsteht 3 KUNDENDIENST Falls der Regler versagt wenden Sie sich bitte an den Kundendienst von GASARC Bitte halten Sie die Modellnummer des betreffenden Produkts ebenso wie zus...

Page 9: ...en ist der Ausgangsdruck des Reglers nach und nach zu erh hen Dazu drehen Sie das Druckregelhandrad im Uhrzeigersinn langsam und erh hen Sie den Druck stufenweise um ca 1 2 bar Dadurch wird sichergest...

Page 10: ...mit PTFE Band beachten um den Ausgang der Fremdgas Sp lvorrichtung mit dem Eingang des Reglers zu verbinden 8 4 Fremdgas Sp lvorrichtung Deep Purge Bedienung Drucklastwechselsp lung Die installierte F...

Page 11: ...onnet Vent Capture Kit die in einen gut bel fteten Bereich f hrt Die Hinweise zum Gebrauch von PTFE Band in den Abschnitt 5 4 und 5 5 1 8 NPT k nnen verwendet werden 9 7 Bevor Sie das System mit Druck...

Page 12: ...3 3 SERVICIO DE ATENCI N AL CLIENTE 13 4 INFORMACI N GENERAL DE SEGURIDAD 13 5 INSTALACI N 14 6 FUNCIONAMIENTO 14 7 DESMANTELAMIENTO 14 8 PURGA 14 8 1 Purga en T Instalaci n 14 8 2 Purga en T Funciona...

Page 13: ...ar un fallo en el equipo p ngase en contacto con el servicio de atenci n al cliente de GASARC Tenga a mano el n mero de modelo del equipo afectado adem s de algunos detalles con respecto a su aplicaci...

Page 14: ...ecesario ajustar la presi n de trabajo del regulador para permitir una ca da de presi n en sistemas grandes o picos en la demanda de caudal 7 DESMANTELAMIENTO 7 1 En primer lugar aseg rese de que hay...

Page 15: ...v lvula de aislamiento de entrada y la v lvula de residuos o de evacuaci n est n cerradas 8 4 4 Abra la v lvula de aislamiento de entrada para que el gas de purga llene la unidad de purga profunda y...

Page 16: ...E DO USU RIO 17 3 ATENDIMENTO AO CLIENTE 17 4 INFORMA ES GERAIS DE SEGURAN A 17 5 INSTALA O 18 6 OPERA O 18 7 DESCOMISSIONAMENTO 18 8 PURGA 18 8 1 T de purga Instala o 18 8 2 T de purga Opera o 18 8 3...

Page 17: ...do equipamento entre em contato com o departamento de atendimento ao cliente da GASARC necess rio fornecer o n mero do modelo do respectivo equipamento al m de informa es sobre sua aplica o 4 INFORMA...

Page 18: ...ala o 7 2 Lentamente feche o cilindro v lvula de isolamento de fornecimento do regulador permitindo que o g s seja purgado pelo regulador ou que saia pelo equipamento ou sistema a jusante Observe que...

Page 19: ...o que o g s de purga encha o conjunto de Purga profunda diluindo todas as impurezas gases corrosivos t xicos e pirof ricos N O EXCEDER 10 bars 150 PSI 8 4 5 Depois de carregado primeiro feche a v lvul...

Page 20: ...77543 WARRANTY INFORMATION Please refer to GASARC website for warranty information GARANTIEINFORMATIONEN Bitte beziehen Sie sich bez glich der Garantie Information auf die GASARC Webseite INFORMACI N...