
Chapter 12
Connection cables
166
Visualyser - Hardware Manual - rev. 1.00
The interface cable shield must be electrically connected to the
case and to the body of the connector itself from both sides of
the cable.
If it is not possible to connect the shield due to the type of
particular serial connector, the shielding itself must be taken
externally to the connector and connected to the earth clamp.
The same operation must also be performed if the body of the
Device serial connector, even if standard, is not electrically
connected to the earth clamp of the PLC itself.
NB: The shield must
be electrically con-
nected to the body
of the connector and
to the cover.
Body of the connector
Conductive cover
Screw fastener
Shield
Conductive cover
Summary of Contents for YT4G Visualyser
Page 1: ...Hardware Manual Rev 1 00 ...
Page 2: ...Visualyser Hardware Manual rev 1 00 ...
Page 8: ...Chapter 1 Premise 4 ...
Page 14: ...Chapter 3 Laying and shielding of cables 10 ...
Page 20: ...Capitolo 4 Power supply 16 ...
Page 21: ...Chapter 5 YT4G Visualyser 17 Visualyser Hardware Manual rev 1 00 YT4G Visualyser 5 ...
Page 24: ...Chapter 5 YT4G Visualyser 20 Visualyser Hardware Manual rev 1 00 Rear ...
Page 26: ...Chapter 5 YT4G Visualyser 22 Visualyser Hardware Manual rev 1 00 Drilling template Front Rear ...
Page 27: ...Chapter 5 YT4G Visualyser 23 Visualyser Hardware Manual rev 1 00 Side ...
Page 45: ...Chapter 6 YT4T Visualyser 41 Visualyser Hardware Manual rev 1 00 YT4T Visualyser 6 ...
Page 48: ...Chapter 6 YT4T Visualyser 44 Visualyser Hardware Manual rev 1 00 Rear ...
Page 50: ...Chapter 6 YT4T Visualyser 46 Visualyser Hardware Manual rev 1 00 Drilling template Front Rear ...
Page 51: ...Chapter 6 YT4T Visualyser 47 Visualyser Hardware Manual rev 1 00 Side ...
Page 69: ...Chapter 7 YT5T Visualyser 65 Visualyser Hardware Manual rev 1 00 YT5T Visualyser 7 ...
Page 71: ...Chapter 7 YT5T Visualyser 67 Visualyser Hardware Manual rev 1 00 Front ...
Page 73: ...Chapter 7 YT5T Visualyser 69 Visualyser Hardware Manual rev 1 00 Rear ...
Page 75: ...Chapter 7 YT5T Visualyser 71 Visualyser Hardware Manual rev 1 00 Drilling template Front Rear ...
Page 76: ...Chapter 7 YT5T Visualyser 72 Visualyser Hardware Manual rev 1 00 Side ...
Page 97: ...Chapter 8 YT7T Visualyser 93 Visualyser Hardware Manual rev 1 00 YT7T Visualyser 8 ...
Page 99: ...Chapter 8 YT7T Visualyser 95 Visualyser Hardware Manual rev 1 00 Front ...
Page 101: ...Chapter 8 YT7T Visualyser 97 Visualyser Hardware Manual rev 1 00 Rear ...
Page 103: ...Chapter 8 YT7T Visualyser 99 Visualyser Hardware Manual rev 1 00 Drilling template Front Rear ...
Page 104: ...Chapter 8 YT7T Visualyser 100 Visualyser Hardware Manual rev 1 00 Side ...
Page 125: ...Chapter 9 YTAT Visualyser 121 Visualyser Hardware Manual rev 1 00 YTAT Visualyser 9 ...
Page 127: ...Chapter 9 YTAT Visualyser 123 Visualyser Hardware Manual rev 1 00 Front ...
Page 129: ...Chapter 9 YTAT Visualyser 125 Visualyser Hardware Manual rev 1 00 Rear ...
Page 132: ...Chapter 9 YTAT Visualyser 128 Visualyser Hardware Manual rev 1 00 Side ...
Page 153: ...Capitolo 10 YXDT Visualyser 149 Visualyser Hardware Manual rev 1 00 YXDT Visualyser 10 ...
Page 157: ...Capitolo 10 YXDT Visualyser 153 Visualyser Hardware Manual rev 1 00 Rear ...
Page 158: ...Capitolo 10 YXDT Visualyser 154 Visualyser Hardware Manual rev 1 00 Side ...
Page 164: ...Capitolo 10 YXDT Visualyser 160 ...
Page 168: ...Chapter 11 Communication ports 164 ...
Page 173: ...Chapter 12 Connection cables 169 Visualyser Hardware Manual rev 1 00 ...
Page 174: ...Chapter 12 Connection cables 170 ...