Installation manual
INSTALLATION
1
NECESSARY TOOLS
Set of screwdrivers
Set of fixed wrenches (17 mm and 13 mm)
Allen key 5mm
Marker pencil
Level
Tape measure
Electric drill and broaches
Use the electrical drill in line with the use
instructions.
2
NECESSARY MATERIALS
Wall support attachment screws
Lubrication grease (graphite or lithium grease).
3
INITIAL CONDITIONS AND CHECKS
Initial conditions of the gate
Check that the size of the gate is within the
admissible range of the operator (see the
technical characteristics of the operator).
If the gate to be automated has a passage gate,
use a safety device to prevent the operator
from operating with the passage gate open.
The gate must have an in-ground central stop.
When installing with an articulated arm, it is
necessary to use the opening and closing stopper.
The gate must be easy to manipulate manually,
namely:
•
This must be balanced, in order to ensure the effort
made by the motor is minimum.
•
There should be no stiffness throughout its travel.
Do not install the operator in a gate which does
not work correctly in manual operation, as this
may lead to accidents. Repair the gate before
installing.
Environmental conditions
This device is not suitable for installation in
inflammable or explosive environments.
Check that the admissible environmental
temperature range for the operator is suitable
for the location.
Electrical power supply installation
The electrical connections shall be made in line
with the instructions in the control panel
manual.
The electrical cable section is indicated in: “Fig. 1
Elements of the complete installation” on page 35.