INSPECTION & MAINTENANCE CHECKLIST
Page 6
We recommend to perform service as per the following schedule:
1 Year 2 Years 4 Years
1.
INSPECTION
(for more details see Inspection & Preparation - Detailed description)
1.1.
Check the Wi-Fi connection
✓
1.2.
Measure water hardness before/after appliance
✓
1.3.
Record Diagnostics parameters of electronic
control panel
(*)
✓
1.4.
Check Configuration Parameters of electronic
control panel
(*)
✓
1.5.
Check Basic Settings of electronic
control panel
(*)
✓
1.6.
Check appliance and surrounding area
for leaks
✓
2.
PREPARATION
(for more details see Inspection & Preparation
–
Detailed description)
2.1.
Disinfect appliance
✓
2.2.
Depressurize appliance
✓
3.
MAINTENANCE
(for more details see available movies)
3.1.
Refill solenoid:
(*)
3.1.1.
Membrane & plunger assembly
clean
replace
3.2.
Back cap:
(*)
3.2.1.
Brine draw restrictor
clean
3.2.2.
Brine draw restrictor check ball
clean
3.2.3.
Brine refill flow control
clean
3.2.4.
Gasket
replace
3.2.5.
Check disc & spring
replace
3.3.
Injector:
(*)
3.3.1.
Disc
clean
3.3.2.
Gasket
replace
3.3.3.
Filter
clean
3.4.
Valve body:
(*)
3.4.1.
Body stem kit
clean
replace
3.4.2.
Body stem seal
clean
replace
3.4.3.
O-ring, seat insert small & large
clean
replace
Summary of Contents for IQsoft IQ-CS-12
Page 15: ...Page 15...