For connecting the wires to the terminals: 
1)

 

use the WAGO terminal  wrench from the supply package or a  watch screwdriver to press 

open the entrance hole of terminals (use of screwdrivers with the blade width exceeding 2.5 mm is 
not allowed) 

2)

 

insert the wire free from insulation into the inlet of the terminal 

3)

 

clamp  the  wire  by  releasing  the  terminal  wrench  or  the  screwdriver;  after  that,  self-

disconnecting becomes impossible 

4)

 

the  terminals  of  the  call  point  allow  clamping  single  wires  or  strand  wires  with  a  cross-

section of 0.08-2.5 mm

2

 (28-14AWG). 

Figure 3.

 

Connection the wire to the terminals of the call point. 

Summary of Contents for IP535-07ea-RS

Page 1: ...nel e mail market eridan zao ru http www eridan ru 2 26 30 50 121 Explosion Proof Addressable Manual Fire CALL POINT IP535 07ea RS Modbus RTU protocol Operation Manual 4371 006 43082497 04 04 2021 EXP...

Page 2: ...degree IP and the operating temperature range of cable glands should correspond to the operating conditions of the call point The call point can be installed in class 1 and 2 indoor explosive areas an...

Page 3: ...vice UDP 4 X4 designation of the version variant for the IP535 07ea RS call point call point class as per GOST R 53325 2012 A class A one step activation B class B activation by performing several act...

Page 4: ...l point are provided via the four wire communication line 2 wires RS 485 line Modbus RTU protocol 2 wires electrical power supply The call points must be connected to communication line in parallel wi...

Page 5: ...r normal climatic conditions withstands a sinusoidal alternating voltage of 0 55 kV 50 Hz during one minute 2 17 Electrical resistance of insulation between the connected output conductors and the cal...

Page 6: ...otection degree IP and the operating temperature range of cable glands should correspond to the operating conditions of the call point By agreement with the customer call points can be equipped with d...

Page 7: ...al power supply The call points must be connected to communication line in parallel with strict observation of polarity Connection diagrams of the call point are shown in Annex B In order to configure...

Page 8: ...s will cause the instrument to receive the Activated signal from the call point device it will display the corresponding message and will send back to the call point an acknowledgement of successful s...

Page 9: ...explosion protection type explosion proof enclosure and explosion protection level 1 The protection degree IP and the operating temperature range of cable glands should correspond to the operating co...

Page 10: ...cover and the body 6 12 The call point must be sealed after installation 7 SAFETY PROVISIONS 7 1 Compliance with the safety rules is mandatory for safe operation and use of the call points 7 2 Any wor...

Page 11: ...n of the call point at the facility must follow the predesigned plan taking into consideration all the requirements hereof 8 5 Prior to installation of the call point at the site remove plugs from the...

Page 12: ...ible 8 21 Check the completed installation by drawing attention to the correctness of the connections the presence of all fastening and locking elements and their correct installation 8 22 Close the c...

Page 13: ...r and its address Customs Union conformity mark name or logo of certification authority and number of the certificate of compliance 9 3 The sequence of marking records is determined by the manufacture...

Page 14: ...1 0 h 10 5 It is strictly prohibited to operate the call point with damaged explosion proof parts and any other defects 10 6 Opening of the call point cover and inspection are only allowed after all...

Page 15: ...he fire device 11 3 In case of other more complicated failures their elimination can be carried out only at the manufacturer s factory Eridan JSC 11 4 In case of the call point s failure there are no...

Page 16: ...al rules of cargo transportation 12 3 During transportation the requirements of the manipulation signs on the transportation packages must be strictly complied with During cargo handling and transport...

Page 17: ...omer 14 CLAIM INFORMATION 14 1 Claims regarding quality of the call point are accepted upon submission of the call point this technical certificate and the report on hidden defects 14 2 The manufactur...

Page 18: ...ed by the Certification Authority OS POZHTEST of FGBU VNIIPO of Emercom of Russia Certificate of compliance with the Technical Regulations of the Customs Union TR CU 020 2011 EAEU No RU RU 40 00693 20...

Page 19: ...holes for sealing with the driving element the arrows on the call point nameplate must face vertically down as per the figure 7 lens 15 disk 23 24 washer 21 bolt 27 magnet 28 sealing ring 29 LED 30 b...

Page 20: ...20 b Appearance of the call point IP535 07ea B...

Page 21: ...3 removable element 4 body 6 cover the arrows on the device nameplate must face vertically down as per the figure 7 lens 8 protective element 15 disk 23 24 washer 21 bolt 27 magnet 28 sealing ring 29...

Page 22: ...ble in cable gland KVBU 1 sheath wall maximum diameter for cable entry Dc 12 mm 2 cable insulation 3 sealing ring along the cable wrapping L 20 mm in uncompressed condition 4 washer 5 lock nut 6 union...

Page 23: ...exceeding 2 5 mm is not allowed 2 insert the wire free from insulation into the inlet of the terminal 3 clamp the wire by releasing the terminal wrench or the screwdriver after that self disconnectin...

Page 24: ...2 Terminal board of the call point IP535 07ea RS Table 5 The terminals designation for the call point IP535 07ea RS No of socket No of contact Designation of contact Description 1 1 6 Usup Feed throug...

Page 25: ...of the contacts of the relay R2 Failure Terminal RTERM and additional RADD resistors are selected in accordance with FACP operation manual Install the jumper in terminals 3 7 of socket 2 of the call p...

Page 26: ...f the call point Figure 5 Diagram of connection of the call point to fire alarm loop activated by closing The off position of the relay R1 Activated is configured as normally closed NC The call point...

Page 27: ...ask and OR mask 0 17 reading and recording of various storage registers 0 2B 0 0E reading of device identifier processing of broadcast packets with a slave device address equal to 0 There is no respon...

Page 28: ...ersion 0 65535 3 0x0008 8 0 03 UINT Serial number Lo 0 65535 0x0009 9 0 03 UINT Serial number Hi 0 65535 0x000A 10 0 03 UINT Device general status 1 6 1 booting 2 test 3 normal 4 acknowledgement reque...

Page 29: ...t is activated 0 Installed 9 15 Reserve 14 Table 8 Configuration register register 50 0 0032 Bit No Designation Note 0 1 Activated signal is registered before reveiving a reset command status registra...

Reviews: