9
INSTALLATION GUIDE
ALWAYS USE TWO PEOPLE WHEN SETTING UP THE BASE.
With the help of an able-bodied assistant, place the carton on the
floor in its desired location with the bottom side facing up. Remove all
tape and binding straps, being careful not to puncture the box with
any sharp objects.
Open the box and remove the plastic bag. Cut the zip ties and set
aside any accessories and electronics. Ensure that all items from the
parts list on page 4 are set aside before proceeding to Step 3.
To install the mattress retainer bar, insert each end of the bar into the
holes at the foot of the base. Rotate the bar so that it is resting on the
edge of the base.
Screw in the leg pads on all four corners of the frame.
Using two people, carefully flip the base to an upright position and move
it to its desired location.
Plug the Puck wireless charger into the extension cord located on the
underside of the bed at the head section. See pages 15-17 for more
information.
STEP 1
STEP 2
STEP 6
STEP 5
STEP 3
STEP 4
Summary of Contents for Dawn House Bed
Page 23: ...21 NOTES...