background image

02172022JA                                                     

www.epvscreens.com

                                    

   U-00249                   6 

Continue attaching the rest of the springs to the material in the following order in 

steps 5-12

 
 
 
 
 
 
 
 
 

 
 

 
 
 
 
 
 
Note (after all springs have been attached): 
Correct material installation

 –Corners of the screen material are properly wrapped around the corner edges of the 

frame and material is evenly tensioned and flat, creating a nicely taut surface.

 

 

 
Incorrect material installation

 –The corners of the screen material are not properly wrapped along the edge of the 

frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from material at 
the corner(s) where material does not lie flat along the edge of the frame, reposition the material so that it lies flat 
and wraps along the edge of the frame, and reattach springs to the material. 

 
Note: 

Please make note of the yellow label and spring in the center of the frame.  This is an indicator to start the 

screen material installation process from the middle area of the frame.

 

 

How to avoid getting ripples on the screen’s material surface

  

Solution:

 

Pull and smooth out the material using your hand from the center to the corners, creating a nicely taut 

surface as shown below

 

 

 

 

 

 

 

Edge Trim Installation 

 

 

Step 11

: Place the edge trim frame 

pieces over each end of the frame.

 

 

 

 

 

 

To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around the 

edges as illustrated in the check mark diagrams. 

 

5

 

6

 

7

 

8

 

9

 

11

 

10

12

 

ATTENTION: THE TOP EDGE TRIM PIECE WITH THE LOGO SHOULD BE INSTALLED ON THE TOP.  

 

Summary of Contents for EDGE FREE Sonic AT8 ISF eFinity Series

Page 1: ...Sonic AT8 ISF which is a high resolution acoustically transparent front projection material for speaker placement behind the screen In order for the Sonic AT8 ISF to maintain its projection qualities...

Page 2: ...Edge Trim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a...

Page 3: ...sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Item Parts List 120 135 a Center Joints M4 bottom position 6 6 b Center Join...

Page 4: ...r corresponding lengths on each edge of the screen as shown below The short rods top bottom will overlap to secure a firm grasp in the middle areas Step 8 Carefully and gently place the assembled fram...

Page 5: ...nd of the spring and secure inside the groove of the frame use the spring hook i to attach the spring to the grommet hole located on the screen material s outer edge in the following order Begin by fi...

Page 6: ...the frame reposition the material so that it lies flat and wraps along the edge of the frame and reattach springs to the material Note Please make note of the yellow label and spring in the center of...

Page 7: ...each corner of the frame as show in the illustration below Step 13 Install the springs q in each middle area to secure the bezel trim edge frame Wall Installation Step 14 Measure the overall length an...

Page 8: ...Elite Prime Vision contact in your area visit www epvscreens com Model Size A Top Wall bracket distance A1 Bracket hole distance B Bottom Wall bracket distance B1 Bracket hole distance C Top Bottom Wa...

Reviews: