EPSON Perfection4180 Photo
Revision A
DISASSEMBLY/ASSEMBLY
Disassembly Procedure
46
4.2.9 Removal of CR Motor Unit, Motor Tension Belt
and CR Tension Belt
1. Remove the Carriage Unit.
2. Disconnect the CR Motor Connector from the Main Board.
3. Remove the Power Cable Cover.
(Refer to Step 5 in 4.2.6 Removal of Power Switch.)
4. Remove the one screw (CBP, M3x8) that is securing the CR Motor Unit, and remove
the CR Motor Unit.
Figure 4-28. Removal of CR Motor Unit
When reinstalling the CR Motor Unit, hook the Harness on the Hooks
and route the Harness.
CR Motor Cable
Hooks
M3x8
Tightening torque 6-8kgfcm
CR Motor Unit
Summary of Contents for Perfection4180 Photo
Page 5: ...Revision Status Revision Date of Issue Description A July 30 2004 First release ...
Page 8: ...C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 19: ...C H A P T E R 2 OPERATING PRINCIPLES ...
Page 23: ...C H A P T E R 3 TROUBLESHOOTING ...
Page 29: ...C H A P T E R 4 DISASSEMBLY ASSEMBLY ...
Page 52: ...C H A P T E R 5 ADJUSTMENT ...
Page 54: ...C H A P T E R 6 MAINTENANCE ...
Page 57: ...C H A P T E R 7 APPENDIX ...
Page 66: ...401 GT F600 PERFECTION 4180 PHOTO NO 1 Rev 01 B170 ACCE 001 10 20 30 40 402 400 ...