EPSON AcuLaser C8500
Revision C
Disassembly/Assembly/Adjustment
Disassembly/Assembly Procedures
3-51
3.2.9.5 XL RAIL ASSY (PL6.1.40) Removal
1.
Remove the TOP COVER ASSY. (See Section 3.2.5.4.)
2.
Remove the DRUM CARTRIDGE. (See Section 3.2.9.1.)
3.
Remove the ROS ASSY. (See Section 3.2.9.3.)
4.
Disconnect the ERASE LAMP ASSY connector (P/J86) and TONER BOX
HARNESS connector (P/J116).
5.
Free the harnesses of the ERASE LAMP harness, ROS HARNESS and
VIDEO HARNESS by removing them from the clamp.
NOTE: Be careful not to damage the IBT BELT ASSY, harnesses, XL RAIL
ASSY, and the Magnet Roll of the Developer Assy while performing
the following.
NOTE: Be careful not to touch the IBT BELT ASSY of Magnet Roll surface
while performing the following.
6.
Remove the 4 screws (silver, w/collar, 6mm) securing XL RAIL ASSY and
remove the XL RAIL ASSY.
Figure 3-55. XL RAIL ASSY Removal
C H E C K
P O I N T
Be careful not to damage the IBT BELT ASSY, harnesses,
XL RAIL ASSY, and the Magnet Roll of the Developer Assy
while mounting.
Be careful not to touch the IBT BELT ASSY of Magnet Roll
surface while mounting.
Summary of Contents for AcuLaser C8500
Page 12: ......
Page 21: ...C H A P T E R 1 PRODUCTDESCRIPTIONS ...
Page 78: ...C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 108: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 31 Figure 2 38 Xerographics II ...
Page 110: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 33 Figure 2 39 Development ...
Page 118: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 41 Figure 2 45 Drive ...
Page 120: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 43 Figure 2 46 Electrical ...
Page 153: ...C H A P T E R 3 DISASSEMBLY ASSEMBLY ADJUSTMENT ...
Page 269: ...C H A P T E R 4 DIAGNOSTICS ...
Page 353: ...C H A P T E R 5 TROUBLESHOOTING ...
Page 480: ...C H A P T E R 6 MAINTENANCE ...
Page 503: ...C H A P T E R 7 APPENDIX ...
Page 564: ......
Page 565: ......
Page 566: ......
Page 567: ......
Page 568: ......
Page 569: ......
Page 570: ......