
Installation
EP-3VBA
Page 3-8
Power On/Off - This is connected to the power button on the case.
Using the Soft-Off by Pwr-BTTN feature, you can choose either
Instant Off (turns system off immediatly), or 4 sec delay (you need
to hold the button down for 4 seconds before the system turns off).
When the system is in 4 sec delay mode, we has added a special
feature to make the system go into suspend mode when the button
is pressed momentarily.
J2
Device Connectors
(continued)
Speaker - Connect to the system's speaker for beeping
1. Speaker
3. GND
2. N/C
4. GND
Reset - Closed to restart system.
Turbo LED indicator - LED ON when higher speed is selected
IR Connector
1. VCC
4. GND
2. NC
5. IRTX
3. IRRX
IDE LED indicator - LED ON when Onboard PCI IDE Hard
disks is activate
Power LED connector
1. Power LED(+)
4. NC
2. N/C
5. GND
3. GND
J3
1
+
+
1
1
Summary of Contents for EP-3VBA
Page 6: ...EP 3VBA Page Left Blank...
Page 13: ...Installation EP 3VBA Page 3 1 Section 3 INSTALLATION...
Page 14: ...Installation EP 3VBA Page 3 2 Figure 1 EP 3VBA Detailed Layout...
Page 22: ...Installation EP 3VBA Page 3 10 Page Left Blank...
Page 50: ...BIOS EP 3VBA Page 4 28 Page Left Blank...
Page 58: ...Appendix EP 3VBA A 8 Page Left Blank...