Epoch Design Seneca Twin over Full Quick Start Manual Download Page 3

To build the long safety rail attach the two long safety 

rails to the upright supports using eight 45mm bolts.

Please note that the head of the threaded inserts face away 

from the 45mm bolts as shown. Tighten with the hex key.

Pre-drilled holes

Have a question? Need a part ASAP? Call 1-800-589-7990 or email [email protected].

     Assemble the twin upper bed by attaching 

the upper end boards to the upper side  

 

 

  rails with the pre-drilled holes  

 

 

  for safety rail attachment. 

 

     Insert barrel nuts into side 

rails. Insert 100mm bolts 

through end boards and 

into the barrel nuts.

1

2

3

4

5

6

    

Tighten 100mm bolts with the 5mm Allen Wrench provided.

LEDGE

     Unroll the slat bundle and lay 

it out strap side down on the 

upper bunk. 

Repeat step 1

Using the parts for the lower bunk.

    **Note: 

The propel nuts are pre-installed into the bed 

 

   rails and face away from the 45mm bolts as shown.

Use 45mm bolts to attach the long safety rail to 

the side rail on the back wall side of the upper bed.

     To install the center support 

     beam align the center rail support 

     (wood side up) between the two headboards, 

     insert 80mm bolts through the end boards and

     into barrel nuts installed in the center support. 

     Using a Phillips head screwdriver and 30mm 

slat screws secure the first slat on one end,  

then the final slat on the other end making 

sure the slats have been distributed evenly. 

Then secure the remaining slats to the rails. 

  

    **Note: 

A power screwdriver with clutch set on    

 

   low is useful here.

      Using a Phillips head screwdriver 

and 30mm slat screws secure the 

first slat on one end, then the final  

 

slat on the other end making  

 

sure the slats have been  

 

distributed evenly. 

 

       Then secure the    

               remaining slats to the rails.

13-Aug-2018

3/4

Reviews: