1
POWER SPECIFICATIONS
Power Supply:
Number of Panels
• 20W
10 Panels
• 40W
18 Panels
• 60W
24 Panels
Power Supply:
Number of Panels
• 100W
40 Panels
• 150W
60 Panels
• 300W
120 Panels
OUR EASY
PLUG AND PLAY
SYSTEM MAKES
INSTALLATION A
SNAP!
POWER IN
12V POWER SUPPLY
LEAD WIRE
LEAD RS232
JUMPER CABLE
(35’)
RS232
JUMPER CABLE
RS232
JUMPER CABLE
GREEN = GROUND
N = NEUTRAL
L = LINE
RJ45 IN
RJ45 IN
RJ45 OUT
RJ45 OUT
+V -V
12V/1.67A
DC OK
+V ADJ
+
100-240VAC
0.55A
50/60Hz
N
L
DC
OK
Leave the lead wire from the EPIC LINK hanging off the side of the first panel so you can connect the next
panel. The flat design of the Epic Link and power supply allows for you to be able to “sandwich” them
between the ceiling and surface mount panels if using spacers. White gaffers tape, glue dots, or double
sided tape are helpful in organizing RJ45 Cables during installation. Typically power supply and power Epic
Link
will be installed above the ceiling.
PLUG AND PLAY COMPONENTS
RS-232
OUT
IN
12VDC
+ --
SERIAL RS-232
POWER
Note:
If you have more than 120 panels, please contact our customer service department.
! WEAR LATEX GLOVES TO KEEP PANELS CLEAN WHILE HANDLING!
EPIC LINK
ALL-STAR™ BOARDS
VERY IMPORTANT:
Make sure your connections
IN
(
GREEN
) &
OUT
(
RED
) are correct from each star
board to ensure proper power and communication. One wrong connection will disrupt communication
to all panels following.
J2
U1
R2
BRIGHT
DIM
R1
S1
J1
LED 4
J2
U1
R2
BRIGHT
DIM
R1
S1
J1
LED 4