http://www.GuitarAmplifierPCBs.com
“Baby Will” Valve Junior Conversion
Version 4
Build Manual
22 September 2009
26 of 36
8. Putting it All Together
8.1 Install the New Components
Now that everything is out of the chassis that we don’t need, the chassis has
been drilled, and the Baby Will has been assembled, we can prep the chassis
and install all of the new components.
8.1.1 The New Output Transformer
Relocate the extra power transformer
grommet from the left-front to the new
hole drilled for the output transformer.
Guide the leads through the grommets
and seat the output transformer in
place. Position the output transformer
with its primary to the front and
secondary to the back as shown.
Guide all of the wires
through the chassis.
(Learn from our mistakes.)
The extra wires will be secured and
stowed inside the chassis. Their
location outside the chassis is too
susceptible to the heat from the tubes.
Secure the output transformer to the chassis using the stock fasteners.