background image

6

Ordering Code - Accumulators

10

Fluid Valve 

material

Carbon steel

Nickel Coated carbon steel 

Stainless Steel

Zn-Ni Coated Carbon Steel

= C 

(standard)

= N
= X
= Z

11

Gas Valve

material

Carbon steel

Nickel Coated carbon steel 

Stainless Steel

Zn-Ni Coated Carbon Steel

= C 

(standard)

= N
= X
= Z

12

Gas Fill Valve 

connection

Standard - 5/8” UNF 

5/8” UNF in Stainless Steel 

Without Gas Fill Valve 

5/16” UNEF/Vg8

1/4” BSP

M16x2.0

5/16” UNEF (7/8 UNF Gas Fill Valve Body)

Double Lock Military Valve

7/8” UNF (Integral in 7/8 UNF Gas Valve)

M28x1.5 

= V 

(standard)

= X
= 0
= 1
= 2
= 3
= 4
= 8
= 9
= M

9

Test 

Certification

Factory Testing   

CE/PED

SELO / ML (China)

ASME Sec.VIII Divn.1 App.22 (w/o stamp) 

ASME Sec.VIII Divn.1 App.22 - U stamp

Others / Dual Certification - on request

= 0
= 8
= 3
= 7W
= 7U

= -
= XX

13

Precharge 

Pressure

Uncharged Condition

Precharge Pressure in bar

14

Other

Variants

Refer 

page 7

= -

*  Before ordering, check for availability

1

2

3

4

5

10

12

  13

14

11

AS

P

360

C

0

C

C

V

35

9

To indicate only if applicable

/ PO:10 /       -        -

6

7

8

G

09

F

Summary of Contents for AS 0.2

Page 1: ...he accumulator shell An inert gas nitrogen is filled into the bladder through a pressure valve to a pressure P The bladder expands filling 0 the entire volume V of the accumulator shell 0 When the sys...

Page 2: ...ruction which is unique to EPE is moulded in a single piece thus obviating problems associated with seamed construction The gas valve is fitted in such a manner which allows it to be connected easily...

Page 3: ...in Gas Precharge Pressure page 3 are valid although as the pressure and above all the velocity of the yield required increase there is the danger that in each cycle the bladder will knock against the...

Page 4: ...For Food P standard B V E K N H F Y A 5 Shell material Carbon Steel Nickel Coated Carbon Steel Stainless Steel Rilsan Coated Carbon Steel C standard N X V 4 Max working pressure Bar For 0 2 AS For 0...

Page 5: ...r variants 01 02 03 04 05 06 07 08 09 10 11 12 13 zz for S 1 1 16 12 1 5 8 12 1 7 8 12 21 22 23 for M M14x1 5 M16x1 5 M18x1 5 M22x1 5 M27x2 0 M32x1 5 M33x1 5 M40x1 5 M42x1 5 M45x1 5 M50x1 5 31 32 33 3...

Page 6: ...g8 1 4 BSP M16x2 0 5 16 UNEF 7 8 UNF Gas Fill Valve Body Double Lock Military Valve 7 8 UNF Integral in 7 8 UNF Gas Valve M28x1 5 V standard X 0 1 2 3 4 8 9 M 9 Test Certification Factory Testing CE P...

Page 7: ...2 NPTF Port Adapter with VS214 Gas Safety Valve set at xxx bar Adapter with VS224X Gas Safety Valve set at xxx bar Adapter with 1 4 BSP Needle Valve Adapter with 1 4 BSP Needle Valve in SS Adapter wi...

Page 8: ...SWP 28 ASWP 35 ASWP 37 ASWP 55 330 360 330 330 360 30 48 70 120 165 bar Pre Max Model A D C F I B E H A F1 A F2 kgs ltrs R G Wt Vol Dry Gas Fluid Port Connection BSP 250 280 300 355 540 405 465 530 57...

Page 9: ...XXX C13384 N10144 O10221 P10149 Q10226 S10228 161013 A12022 H12025 R12031 B10202 C10205 E10109 F10103 ASSY17 G10305 I10222 211030 K10227 L10223 M10217 05XXXX C13384 N10144 O10221 P10149 Q10226 S10228...

Page 10: ...ASLVHF 475 ASLVHF 530 ASLVHF 575 Model A F1 A F2 32 70 70 80 120 11 14 56 56 140 140 74 88 130 I H 290 460 355 412 472 470 610 750 895 1025 1325 1392 1791 1132 1347 1688 1787 2112 2552 2805 2987 1222...

Page 11: ...ASWD 4 6 ASWD 10 55 ASLV 150 575 ASLVHF 150 575 B10202 C10205 E10109 F10103 ASSY17 G10305 06XXXX C13384 I10446 212013 A12042 R12385 A12042 N A B10333 C10334 E10302 F10301 ASSY17 G10306 06XXXX C39XXX...

Page 12: ...thout Gas Fill Valve Transfert Liquid Separator type 5 16 UNEF Vg8 1 4 BSP M16x2 0 5 16 UNEF 7 8 UNF Gas Fill Valve Body Double Lock Military Valve 7 8 UNF Integral in 7 8 UNF Gas Valve M28x1 5 V stan...

Page 13: ...suitable for operating temperature 20 C to 85 C Other materials as indicated in ordering code also available THE GAS VALVE is of phosphated carbon steel in the following three versions S STANDARD Fitt...

Page 14: ...ype M22 M22 B Type M50 Type M30 Type M22L Type M50L Type MU7 8U Type MU7 8V 5 8 UNF M30x1 5 M22x1 5 M22x1 5 M50x1 5 7 8 UNF Fill Valve Fill Valve Fill Valve Fill Valve Fill Valve M50x1 5 M50x1 5 M50x1...

Page 15: ...fer Bladder Ordering Code Page 12 15 Type U7 8 Type U7 8V U7 8V B Type U7 8U Type U5 8 SL Type M22 SL Type M50 SL Type M22 ST Type M50 ST M50x1 5 M50x1 5 M22x1 5 M22x1 5 7 8 UNF 7 8 UNF Fill Valve 7 8...

Page 16: ...for screw in fill valve M50x1 5 M Body for screw in fill valve long body 7 8 UNF M Body for screw in fill valve 7 8 UNF M with Integral Vg8 fill valve 7 8 UNF M with Integral Vg8 fill valve for Bosch...

Page 17: ...BD 50 BD 75 360 360 360 bar Pre Max Model kgs ltrs Fig Wt Vol Dry Gas 8 9 10 Gas Bottle design Accumulator design Neck design Threaded design Ordering Code Dimensions Gas Bottles 1 2 3 4 5 6 BB 0 360...

Page 18: ...ensions determined by the flow rate and operating pressure connects the various blocks The two ends have a BSP female thread or on request are flanged One of the ends is closed off with a plug or blin...

Page 19: ...cal process must be carried out on the accumulator shell for the purpose of attaching fastenings CONNECTION adopters and flanges are available on request When fitting screws reducers or the safety and...

Page 20: ...ng a pressure slightly above the required level Close the valve of nitrogen cylinder and disconnect the charging hose from the equipment Wait for the gas temperature stabilization Set the pressure by...

Page 21: ...esired pressure Adjust by means of bleed valve remove the filling unit Use soapy water test for leaks Replace the valve cover and protection cap The accumulator is ready for use Standard equipment PC...

Page 22: ...id port body into the vessel and remove the gasket and O Ring Fig D 4 Remove by bending the rubber coated retaining ring Fig D 5 Remove the fluid port body Fig D 6 Remove the nut holding the gas valve...

Page 23: ...Charging page 20 and again tighten the gas valve nut Low Pressure Range ASWD Insert the bladder use a threaded tube M 12 x 1 5 Mount name plate and nut for the gas valve body Tighten the nut holding t...

Page 24: ...ifferent fluid than those designed for Installation Before installation you must perform a visual check to verify that the accumulator has not suffered any damage during shipping handling Verify that...

Reviews: