![Epcom EPIG5K User Manual Download Page 5](http://html1.mh-extra.com/html/epcom/epig5k/epig5k_user-manual_2417218005.webp)
- 3 -
¾
The connection to the distribution grid must be done only after receiving approval
from the distribution utility as required by national and state interconnection
regulations, and can be done only by qualified personnel.
¾
Comply with all corresponding marks and symbols present on each device. During
operation, make sure that all covers and doors are closed.
DANGER!
Unauthorized removal of the necessary protections, improper use, wrong
installation or wrong operation may lead to serious damage to people and
objects.
Transport, handling, installation, start-up and maintenance must be performed
by qualified and trained personnel.
DANGER!
After disconnecting the inverter from distribution grid, wait for 60 seconds for
capacitors to discharge before servicing or touching any live part and electric
connection.
WARNING!
The installation must be performed in full compliance with national and local
standards and regulations.
WARNING!
When the photovoltaic array is exposed to light, it supplies a DC voltage to the
PCE. To ensure a safe work environment, keep the whole surface of the
photovoltaic panel covered with material opaque to solar radiation before
connecting panel to equipment.
WARNING!
Make sure the DC input voltage does not exceed 520V, or it may damage this
inverter permanently and cause other losses.
Summary of Contents for EPIG5K
Page 1: ...EPIG5K...
Page 2: ......