17
EN
9.
Put the cover on the vessel again. Make sure that the silicone seal ring fits on the mounting holes
so that the Allen screws can be tightened. Also pay attention that the baffle plate on the bottom
side of the cover will not be bended. Connect the steam pipeline back to the steam output con-
nector on the steam generator.
10.
Before commissioning verify that all screws are tight. The entire system has to be checked on
tightness.
5.6 Checking the level probe
level sensor
current flow
Loosen the 3 Allen screws (A), lift disc (B) with seal (C) and pull level probe upwards out of the tank.
Unplug the level probe cable from the the main board
The level probe can be checked for proper functioning with a regular multimeter.
The float in top position - signal should pass through (resistance 0
W
), float in bottom position - no
signal should pass through (resistance
∞
).
A
B
C
open