background image

12

EN

Discharge hose from over-

pressure release valve

Pilot lamp for operation 

status and error codes.

Water supply connection, 

3/4” external thread

Drain

Descaler level 

probe cable

Cable glands for con-

trol unit connection

Connection tube for desca-

ling (cleaning) system

Steam output pipe, 1 1/4” 

external thread

5.2 SteamRock Basic - construction overview

Overpressure release valve 

with drain hose
Water tank / water tank lid

Water filling line (slow)

Water filling line (fast) / 

pressurized water injection

level sensor

Descaler filling tube

Steam output pipe with 

pivot joint

Chassis with ventilation 

openings

B o t t o m 

view

view 

from top

Power supply cable with plug

Sicht von 

oben

Summary of Contents for SteamRock Basic

Page 1: ...INNOVATIVE SAUNA TECH NOLOGY Made in Germany SteamRock Basic steam generator EN Installation and operation manual print no 29344968 42 19 Subject to technical changes Version 09 firmware R0 91...

Page 2: ...6 Checking the level sensor 17 5 7 Water supply and drain 18 5 8 Steam pipe connection 18 6 Electrical connection 19 6 1 SteamRock Basic 18 kW terminals 19 6 2 SteamRock Basic 9 kW terminals 20 6 3 In...

Page 3: ...rrently applica ble European safety norms and are produced in our factory in accordance with the quality man agement norms DIN EN ISO 9001 2008 This installation manual or operating guide is intended...

Page 4: ...Saunatechnik GmbH 1 3 Identification of the product Steam generator SteamRock Basic 1 4 Intended use The SteamRock Basic steam generator is intended for production of steam in steam rooms or sau na r...

Page 5: ...and similar electrical appliances Safety Part 2 53 Particular requirements for sauna heating appliances and infra red cabins DIN EN 60335 2 98 2009 04 Household and similar electrical appliances Safet...

Page 6: ...lo callegalcodesandsafetyrequirementsshouldbeobserved Inthe caseofawarrantyclaimaproofofsuchinstallation e g invoiceof the electrician should be presented DANGER Risk of health damage by too long ope...

Page 7: ...ipe should be in stalled and connected so that it the case of a unforeseen release of hot water by overpressure there is no risk of scalding DANGER Danger to life and risk or dangerous to life injurie...

Page 8: ...ticslike PVC It must be ensures that the water supply line does not use any ma terials which may contain plasticizers ATTENTION In areas with hard water over 5 dH it is recommended to install a water...

Page 9: ...mp external 5 l container for cleaning liquid with level probe Water drain 1 drain pipe at the unit s bottom side Water level control Automatic with overheating protection Control system not included...

Page 10: ...vel probe Installation manual and operating guide Pre mounted power supply cable with CEKON type plug 16A or 32A Steam outlet Accessories optional Filtering grill for drain blockage prevention item 94...

Page 11: ...am pipeline Cabin light Steam outlet Door Exhaust vent in ceiling T e m p e r a t u r e sensor Floor drain in the steam room Container for descaler liquid Steam generator for temperature sensor instal...

Page 12: ...e for desca ling cleaning system Steam output pipe 1 1 4 external thread 5 2 SteamRock Basic construction overview Overpressure release valve with drain hose Water tank water tank lid Water filling li...

Page 13: ...valve Pilot lamp for operating status and error codes Fuse switches 9 kW F1 F2 F3 18 kW F1 F2 F3 F4 F5 F6 Peristaltic pump for clean ing descaling system Connection tube for desca ling cleaning syste...

Page 14: ...sure that the wall is able to carry the load of min 45 kg We recommend to allow certain reserve for safety Please consider that the steam generator is subject to light vibrations during operation To m...

Page 15: ...e steam generator with the corresponding mounting holes in the chas sis on these two screws Make sure that the generator is hanging vertically by using a spirit level After that secure the generator b...

Page 16: ...m the power supply and turn off the water 2 8 Lift the cover with the connected compo nents slightly till it to the right and take it out of the vessel 7 Disconnect the steam pipe connection 3 3 Loose...

Page 17: ...efore commissioning verify that all screws are tight The entire system has to be checked on tightness 5 6 Checking the level probe level sensor current flow Loosen the 3 Allen screws A lift disc B wit...

Page 18: ...service life of the heat ing elements and of the generator By commercial use it is obligatory to install a water softening system in order to reduce the amount of limescale getting into the generator...

Page 19: ...steam output pipe features an innovative pivot joint connection at the water tank lid You can turn the pipe around to rise upwards For this unscrew the fix ation nut in the bottom plate and turn the...

Page 20: ...or connection the appropriate socket with fuse protection has to be used The control unit is connected as shown in the connection diagram on pages 21 22 In order to simplify the installation the termi...

Page 21: ...external control is connected to terminals 14 to 19 9 kW Fig 7 or 21 to 26 version 18 kW Fig 6 A fragrance container is placed on terminals 20 and 21 9 kW or 27 28 18 kW The control lines are potenti...

Page 22: ...22 EN 6 3 SteamRock Basic inner wiring diagram SteamRock Basic 9 kW Stromlaufplan SteamRock Basic 9 kW...

Page 23: ...23 EN SteamRock Basic 18 kW Stromlaufplan SteamRock Basic 18 kW Stand 12 2018...

Page 24: ...b brige Anschl sse gem Gebrauchsanleitung Additional connections according to the user manual ST2 ST1 Duftstoffbeh lter mit Sonden optional Essence container with level probes optional PE Gr S1 N Wb b...

Page 25: ...chsanleitung Additional connections according to the user manual N A2 FRAGRANCE 25 26 27 28 N A2 FRAGRANCE WM Emotec H EmoTouch 3 ECON H PE Gr S1 N Wb brige Anschl sse gem Gebrauchsanleitung Additiona...

Page 26: ...should be carried out by a licensed and appropriately qualified electrician with the respect to the men tioned norms and codes e g VDE 0100 part 701 All works may be only carried out when the steam g...

Page 27: ...ritating on skin and eyes Make sure to wear appropriate protection and observe due precautions by refilling the container Avoid contact with clothing For further details please refer to the safety adv...

Page 28: ...generator is operated in a manual non stop mode a forced descaling cycle will be carried out after 24 h of operation The descaling cycle will be also started if the steam generator has reached the ca...

Page 29: ...in after heating mode in the 18 kW model Figure 9 shows F1 F6 fuses in the 18 kW model The 9 kW version fea tures F1 F3 respectively In order to reduce power switch the fuse to the RIGHT Each switch...

Page 30: ...poweroutputmayonlybecarriedoutbyaqualifiedspecialist Make sure to conduct a practical test to ensure that the steam room functions correctly after the power adjustment Special attention is required fo...

Page 31: ...atus LED that indicates current operating conditions or malfunctions The operating light is located on the bottom side of the device see page 12 The status LED does not light up when the device is swi...

Page 32: ...of the Reset button causes damage to the thermo fuse and malfunctions and may lead to overheating and consequential damage to the steam gener ator Only trained personnel are authorised to perform trou...

Page 33: ...For questions and assistance with service contact your author ized EOS dealer Recommended maintenance intervals Private use once a year Commercial use at least twice per year or more depending on inte...

Page 34: ...ow pressure Solution Check the limiter fuse for correct position Inspect water tank for limes cale and clean if necessary Check water supply line Reason Water foaming through contamination by oils pla...

Page 35: ...ution Check if the water may be foaming due to contamination with oils or similar substances Clean the tank if necessary Reason Steam pipe installed incorrectly steam pipe blocked by condensed water S...

Page 36: ...your questions quickly and compe tently please provide the information printed on the type shield including the model item no and serial no in all inquiries Equipment commissioning date ______________...

Page 37: ...roducts is designed for the ship ping of individually packed goods pallet We expressly point out that our packaging is not suitable for individual shipments via parcel post The manufacturer shall acce...

Reviews: