62
Installation and Operating Instructions - EOS Herkules XL S120
Maintenance
EN
4
Loosen the two hexagon nuts of the tubular heating element to be re-
placed located in the terminal box.
5
Remove the tubular heating element.
6
Insert the new tubular heating element and tighten.
7
Plug in the flat plugs belonging to the tubular heating element to be re-
placed.
8
Insert the heating coil.
See
Inserting the heating coil
1
Insert the heating coil.
2
Screw in the 8 hexagon socket screws and tighten them.
3
Connect the connection cables.
See 4.2 Sauna heater circuit diagrams,
4
Close the heater housing.
See
Closing the terminal box for the heating coil,
5
Switch on the fuses for the heater to establish a connection between
them and the mains supply.