4) Assembly:
INSTALLATION GUIDE
Figure 4.4.4
Figure 4.4.5
Figure 4.4.6
Locate (2) Slide-stop brackets with the magnets
attached and (4) #8 x 0.75” Pan head wood screws.
Confirm that the sliding top is in the closed position.
Place the Slide-stop bracket on the work surface and
align the clearance slots with the pre-drilled holes in
the work surface.
Allow the magnet to attach to the front crossbar of the
Bolted Frame assembly. Verify that the clearance slots
still line up with the pre-drilled holes.
Attach the Slide-stop bracket to the work surface using
(2) #8 x 0.75” Pan head wood screws.
Complete the above steps for the second Slide-stop
bracket.
Slide-Stop Bracket Attachment Cont.