![Enwork Grid XTB Installation Instructions Manual Download Page 7](http://html1.mh-extra.com/html/enwork/grid-xtb/grid-xtb_installation-instructions-manual_2416530007.webp)
STEP 3: ASSEMBLE 2-PACK
GRID BASES
End of Run,
WITHOUT End Panel
Mid Run, or End of
Run WITH End Panel
Take special notice to link orientation. Slots
must face towards the outside of the
assembly in all mid run conditions, and in all
end of run conditions where an end panel
will be installed. In end of run conditions
where there will be no end panel, the slots
must face toward the inside of the assembly.
M8 Flange Nut
M8 Flange Nut
(qty 8)
6
Summary of Contents for Grid XTB
Page 1: ...Rev 0715 Grid XTB with UMM bases Shipped after March 2015 Installation Instructions...
Page 6: ...STEP 3 TERMINOLOGY End of Run Mid Run End of Run 5...
Page 10: ...STEP 6 LEVEL AND ALIGN ENTIRE ASSEMBLY ALIGN SPINE LEVEL ALONG SPINE LEVEL ASSEMBLY 9...
Page 11: ...STEP 7 REMOVE FRAME TOP CAP Use 2 square drive bit to remove attachment screws 10...
Page 12: ...STEP 8 CONNECT FRAMES 10 24 X 3 8 PAN HEAD SCREW qty 2 10 24 NYLOCK NUT qty 2 11...
Page 15: ...STEP 12 ATTACH WORKSURFACES 14...