STEP 11: ATTACH TOPPER
SCREENS
a) CHECK TO BE SURE CHANNEL IN FRAME IS CLEAR OF DEBRIS
b) TRIM GASKET TO LENGTH OF TOPPER SCREEN
c) INSTALL GASKET ONTO SCREEN
d) WIPE OUTSIDE OF GASKET DOWN WITH SOAPY WATER IN
ORDER TO HELP LUBRICATE INSTALLATION
e) USING TWO PEOPLE, CENTER GASKET ON FRAME, AND FIRMLY
PRESS DOWN INTO CHANNEL. BE SURE THAT SCREEN BOTTOMS
OUT FULLY INTO THE CHANNEL.
Channel
Topper Screen
Gasket
13
Summary of Contents for Grid XTB
Page 1: ...Rev 0715 Grid XTB with UMM bases Shipped after March 2015 Installation Instructions...
Page 6: ...STEP 3 TERMINOLOGY End of Run Mid Run End of Run 5...
Page 10: ...STEP 6 LEVEL AND ALIGN ENTIRE ASSEMBLY ALIGN SPINE LEVEL ALONG SPINE LEVEL ASSEMBLY 9...
Page 11: ...STEP 7 REMOVE FRAME TOP CAP Use 2 square drive bit to remove attachment screws 10...
Page 12: ...STEP 8 CONNECT FRAMES 10 24 X 3 8 PAN HEAD SCREW qty 2 10 24 NYLOCK NUT qty 2 11...
Page 15: ...STEP 12 ATTACH WORKSURFACES 14...