Enwork Grid XTB Installation Instructions Manual Download Page 1

Rev 0

7

15

Grid XTB 

with 

UMM

 

base

s

(Shipped 

after 

March, 2015) 

Installation Instructions

Summary of Contents for Grid XTB

Page 1: ...Rev 0715 Grid XTB with UMM bases Shipped after March 2015 Installation Instructions...

Page 2: ...Tools Needed 1 4 Drive Socket Wrench 13mm Socket Drill Driver 2 Phillips Bit 2 Square Drive 5mm 6mm Allen Wrench Tape Measure 3 8 Box End Wrench 1...

Page 3: ...12MM Button socket head cap screw qty 8 M6 1 0 x 30mm Socket head cap screw qty 12 Socket Bushing qty 12 PARTS AND HARDWARE NEEDED FOR STEP 1 Top Supports Left Hand Column Right Hand Column Rail Comp...

Page 4: ...RIGHT SIDE OUTER RAIL LEFT SIDE OUTER RAIL INSIDE RAIL M8 1 25 X 12MM PRESSURE PLATE SOCKET BUSHING M6 1 0 X 30MM STEP 1 ASSEMBLE ALL SINGLE SIDES OF GRID BASES 3...

Page 5: ...X 3 Pan Head Machine Screw 1 4 28 X 3 Pan Head Machine Screw 1 4 28 Hex Nut 1 4 28 X 1 Pan Head Machine Screw qty 1 for optional riser 1 4 28 X 3 Pan Head Machine Screw qty 1 1 4 28 Hex Nut qty 1 NOT...

Page 6: ...STEP 3 TERMINOLOGY End of Run Mid Run End of Run 5...

Page 7: ...e to link orientation Slots must face towards the outside of the assembly in all mid run conditions and in all end of run conditions where an end panel will be installed In end of run conditions where...

Page 8: ...STEP 4 CONNECT INDIVIDUAL 2 PACKS INTO 4 6 OR 8 PACKS WORKSTATIONS 1 4 28 X 1 Pan Head Machine Screw 1 4 28 X 1 Pan Head Machine Screw qty 2 per Cross Link Cross Link qty 2 7...

Page 9: ...STEP 5 CONNECT FRAME TO BASE 10 24 X 2 SOCKET HEAD CAP SCREW 10 24 X 2 SOCKET HEAD CAP SCREW qty 4 per frame UZWNUTA qty 4 per frame UZWNUTA Align to center set of holes in frame when attaching 8...

Page 10: ...STEP 6 LEVEL AND ALIGN ENTIRE ASSEMBLY ALIGN SPINE LEVEL ALONG SPINE LEVEL ASSEMBLY 9...

Page 11: ...STEP 7 REMOVE FRAME TOP CAP Use 2 square drive bit to remove attachment screws 10...

Page 12: ...STEP 8 CONNECT FRAMES 10 24 X 3 8 PAN HEAD SCREW qty 2 10 24 NYLOCK NUT qty 2 11...

Page 13: ...ONNECTIONS MAKE ALL POWER AND DATA CONNECTIONS DROPPING THE CABLES IN THE OPENING CREATED BY REMOVING THE FRAME TOP CAP IN STEP 6 EXAMPLES SHOWN IN PICTIRES BELOW STEP 10 RECONNECT GRID TOP CAP THAT W...

Page 14: ...ENGTH OF TOPPER SCREEN c INSTALL GASKET ONTO SCREEN d WIPE OUTSIDE OF GASKET DOWN WITH SOAPY WATER IN ORDER TO HELP LUBRICATE INSTALLATION e USING TWO PEOPLE CENTER GASKET ON FRAME AND FIRMLY PRESS DO...

Page 15: ...STEP 12 ATTACH WORKSURFACES 14...

Page 16: ...L Socket Bushing qty 4 per end panel M6 1 0 x 30mm Socket head cap screw qty 4 per and panel Threaded Insert qty 4 per end panel M6 1 0 x 30mm Socket head cap screw Socket Bushing Threaded Insert Use...