Envision NDZ 022 A11AC Installation Manual Download Page 21

21

ENVISION SERIES INSTALLATION MANUAL

DIP SWITCH 

NUMBER

DESCRIPTION

OFF POSITION

ON POSITION

SW1

N/A

NOT USED

N/A

N/A

SW2

1

Service/Test Mode - 

Allows control of “NORM” or “TEST” opera

-

tional modes.  Test mode accelerates most timing functions 16 

times to allow faster troubleshooting. Test mode also allows view

-

ing the “CURRENT” status of the fault inputs on the LED display.

Test

Norm

2

Freeze Sensing Setting

Allows field selection of freeze thermistor fault sensing tempera

-

tures for well water (30°F) or antifreeze-protected (15°F) earth 

loops.

Loop  

(Protection 15° F)

Well  

(Protection 30° F)

3

Accessory Relay

Allows field selection of the accessory relay to operate with the 

compressor or fan.

Fan

Comp

4

NOT USED

N/A

N/A

5

NOT USED

N/A

N/A

6

Input Diagnostics - 

Allows viewing the inputs from the thermo

-

stat to the control board such as Y1, Y2, O, G, W, SL1-In on the 

LED display.

Diagnostic Inputs 

viewed at LEDs

Normal Display 

viewed at LEDs

7

Output Diagnostics - 

Allows viewing the outputs from the control 

board such as the compressor, reversing valve, blower, hot water 
pump, and loop pump on the LED display.

Diagnostic

Outputs viewed at 

LEDs

Normal 

Display viewed

at LEDs

8

Thermostat Selection 

Configures the control for a pulsed lockout signal (ComforTalk and 
FaultFlash thermostats) or continuous 5 VAC lockout signal.

Pulsed “L” 

signal

Continuous “L” 

signal

SW

1

Single or Dual Capacity Operation

Dual Cap

1 Speed

2

Zoned/Finish on Second Stage

This switch allows the unit to down stage with the thermostat 
when off and finish with second stage when on.  Finish on second 

stage reduces stage changing in reciprocating dual capacity 
compressors.

Normal - 

All other systems

Finish on 2nd 

Unzoned Dual 

Capacity 

E-Series or 

Premier 2 speed

3

ECM Fan Monitoring - Set for No PRM on split systems

No RPM

RPM

4

NOT USED

N/A

N/A

5

On dual capacity units this switch allows stage change: on the fly 
when off, and 1 minute delay when on.  A delay is required on all 

reciprocating dual capacity units.

Envision

E-Series or 

Premier

DIP Switch Settings

Summary of Contents for NDZ 022 A11AC

Page 1: ...uperheater Connections Electrical Startup Procedures Troubleshooting Preventive Maintenance IM1592 06 07 Envision Series Geothermal Indoor Split Heat Pumps R 410A Refrigerant 2 6 Ton Single Speed 2 6...

Page 2: ...6 1 59 56 1 59 74 2 1 90 2 55 92 2 61 108 3 06 52 1 47 56 1 59 90 2 55 92 2 61 104 2 95 Coax and Water Piping Water Connections Size Swivel in mm 1 25 4 HWG Connection Size Swivel in mm 1 25 4 Coax Pi...

Page 3: ...ed Loop Ground Source Systems 12 Desuperheater 13 14 Electical Data 14 Thermostat Wiring 15 Wiring Schematics 16 17 Microprocessor Control Features and Operation 18 19 Operation Logic Data 20 DIP Swit...

Page 4: ...are located in unconditioned spaces to prevent damage from frozen water lines and excessive heat that could damage electrical components Air Coil Location Refer to the air handler manufacturer s instr...

Page 5: ...ing an Envision Split to an air handler coil Select R 410A components only Select 12 SEER or higher air handler coil Match the air handler to the air handler coil data table on page 9 Indoor matching...

Page 6: ...e capacity of the unit refer to page 9 Line sets should be routed as di rectly as possible avoiding unnecessary bends or turns All wall penetrations should be sealed properly Line set should not come...

Page 7: ...oil should be located in the supply side of the furnace to avoid condensation damage to the furnace heat exchanger A high temperature limit should be installed upstream of the coil to de energize the...

Page 8: ...swivel connector prior to attempting any connection The rubber seals are shipped attached to the waterline To make the connec tion to a ground loop system mate the brass connector supplied in CK4L con...

Page 9: ...8 OD 3 4 OD 3 8 OD 7 8 OD 1 2 OD 74 NZ048 NAH060 3 4 OD 3 8 OD 7 8 OD 3 8 OD 7 8 OD 1 2 OD 90 NZ060 NAH060 7 8 OD 1 2 OD 7 8 OD 1 2 OD 1 1 8 OD 1 2 OD 92 NZ070 NAH060 7 8 OD 1 2 OD 7 8 OD 1 2 OD 1 1 8...

Page 10: ...storm sewer drain field adjacent stream or pond etc Most local codes forbid the use of sanitary sewer for disposal Consult your local building and zoning depart ments to ensure compliance in your are...

Page 11: ...iron bacteria will be pres ent a closed loop system is recommended The heat exchanger coils in ground water systems may over a period of time lose heat exchange capabilities due to a buildup of miner...

Page 12: ...in the specification cata log Usually 2 5 to 3 GPM of flow per ton of cooling capacity is recommended in earth loop applications Multiple Units on One Flow Center When two units are connected to one l...

Page 13: ...erheater pump to operate during these conditions actually removes heat from the DHW circulating through the unit To overcome this Envision unit microprocessors have been programmed to disengage the de...

Page 14: ...ndicator plug 1 turn on the motor end of the pump until all air is purged from the pump then tighten the plug Use vent couplings to bleed air from the lines 6 Carefully inspect all plumbing for water...

Page 15: ...ay Note Field installed DPST dual fuel relay Required for dual fuel installation Auxiliary Heat Relay P2 P1 Shut Down chassis Envision Split Auxiliary Heat Relay HWA Ext Total Min Max Pump Loop Unit C...

Page 16: ...lug Ground Fuse CC CO CR1 CR2 CR3 CR4 F1 and F2 WCL HE HP LP PB1 PB2 PS RV SW1 SW2 SW3 SW4 TS Compressor Contactor Condensate overflow sensor DHW pump relay Loop pump relay Fuses Water Coil Limit Sens...

Page 17: ...ON for unzoned Dual Cap E Series or Premier 2 speed units Thermistor Light emitting diode Green Relay coil Capacitor w bleed resistor Switch Condensate overflow Switch High pressure Switch Low pressur...

Page 18: ...ons resume on the next compressor cycle or after 15 minutes of continuous compressor operation during the current thermostat demand cycle Hot Water Justification Since compressor hot gas temperature i...

Page 19: ...ard Fan G only The fan starts on low speed PSC ON Regardless of fan input G from thermostat the fan will remain on low speed for 30 seconds at the end of each heating cooling or emergency heat cycle L...

Page 20: ...ondary 1 Out On On On Off On On Emerg LED Off Off Off On Off Off Off T Stat Signal Y1 Y1 Y2 Y1 Y2 W W Y1 O Y1 Y2 O G DUAL CAPACITY UNITS Compressor Lo On Off Off Off On Off Compressor Hi Off On On Off...

Page 21: ...play viewed at LEDs 7 Output Diagnostics Allows viewing the outputs from the control board such as the compressor reversing valve blower hot water pump and loop pump on the LED display Diagnostic Outp...

Page 22: ...hould be painted with UV resistant paint or covering to insure long insulation life Fasten the copper line set to the blower coil unit as instructed by the coil installation instructions shown in Figu...

Page 23: ...ling should rise and the superheat should fall until 8 16 degrees of superheat is reached when the TXV should be metering the system See operating details in the startup section of this manual for exa...

Page 24: ...e liquid line just outside the split cabinet This location will be adequate for measurement in both modes unless a significant temperature drop in the liquid line is anticipated Measure the liquid lin...

Page 25: ...6 128 5 586 146 5 108 35 4 228 78 1 348 106 7 468 128 8 588 146 8 110 36 4 230 78 7 350 107 2 470 129 1 590 147 1 112 37 3 232 79 2 352 107 6 472 129 4 592 147 3 114 38 2 234 79 8 354 108 0 474 129 8...

Page 26: ...Suction Pressure PSIG Discharge Pressure PSIG Superheat Subcooling Water Temp Drop F Air Temp Rise F DB 1 5 69 81 254 334 7 13 5 13 7 10 18 24 3 0 75 87 260 340 7 14 5 13 3 6 20 26 1 5 98 113 293 373...

Page 27: ...9 14 7 15 8 12 24 28 3 0 140 160 335 390 9 14 7 15 6 10 22 30 Second Stage Operation Suction Pressure PSIG Discharge Pressure PSIG Superheat Subcooling Water Temp Rise F Air Temp Drop F DB 1 5 120 13...

Page 28: ...e cooling mode Cooling setpoint must be set below room temperature 3 First stage cooling will energize after a time delay 4 Be sure that the compressor and water control valve or loop pump s are activ...

Page 29: ...ation papers Final Evaluation After the initial check of superheat subcooling values in the heating mode shut off the unit and allow it to sit 3 to 5 min utes until pressures equalize Restart the unit...

Page 30: ...sure suction temperature here at TXV bulb in cooling modes Cooling Cycle Analysis COOLING TXV ACTIVE RIGHT TO LEFT ClgTXV Measure liquid line temperature and pressure here in both heating and cooling...

Page 31: ...4 18 6 0 5 7 5 3 4 9 4 6 21 7 8 7 3 6 8 6 4 5 9 10 2 3 2 1 2 0 1 9 1 7 13 3 6 3 3 3 0 2 8 2 6 16 5 0 4 6 4 3 4 0 3 7 19 6 5 6 2 5 8 5 4 5 0 5 30 06 038 full load 049 part load 064 full load 072 part l...

Page 32: ...ed and super heat and subcooling numbers calculated If superheat and subcooling are outside recommended ranges an adjustment to the refrigerant charge may be necessary Notes Refrigerant tests must be...

Page 33: ...essary Units should never be operated without a filter Condensate Drain In areas where airborne bacteria produce a slime in the drain pan it may be necessary to treat chemically to minimize the proble...

Page 34: ...0 UNIT DEPTH D 1 93 D 2 21 WATER IN E 6 93 E 7 21 WATER OUT F 8 44 F 9 21 BRASS SERVICE VALVE LIQUID G 11 55 G 12 14 BRASS SERVICE VALVE GAS H 13 43 H 15 83 DESUPERHEATER IN J 16 43 J 18 83 DESUPERHEA...

Page 35: ...35 ENVISION SERIES INSTALLATION MANUAL Installation Notes...

Page 36: ...duct research and development and reserves the right to change design and specifications without notice 2007 WFI Product Envision Series Type Geothermal Indoor Split Heat Pumps Size 2 thru 5 5 Ton Sin...

Reviews: