AFTER INSTALLATION THE END USER SHOULD
KEEP THIS GUIDE FOR FUTURE REFERENCE
DO NOT
THROW AWAY
8
Pre - Installation Checklist
• Does the unit fit through the loft hatch?
• Check there are no obstructions in the hallway or landing where the
diffuser is to be fitted and in the loft space above.
• Ensure the loft has adequate cross-flow ventilation to provide a
supply of fresh air to the unit.
• Check that all partition walls are intact. Seek building advice if any
are missing or broken.
• Check for flued appliances drawing air from the loft, the user should
be made aware of any of these.
• Check that any flue passing through the loft is undamaged. Seek
building advice if any are damaged or broken.
• Repair any ceiling gaps which allow air leakage into the loft.
• Ensure any loft water storage tanks are covered and sealed.
About PIV & MIV Air Source & Inline units
Positive Input Ventilation (PIV) and Multiple Input Ventilation (MIV) units
create fresh and healthy living environments by supplying filtered air
into a property at a continuous rate through ceiling mounted diffusers.
The diffusers are normally installed in a hallway or landing area.
The units have been developed to improve indoor air quality and resolve
condensation and mould problems and are designed to operate for 5
years with no requirement for maintenance other than replacement of
the filter. It is recommended that the filters are replaced after 5 years
usage.