Initial Installation
QUALIFIED INSTALLERS ONLY
WARNING:
Operation of this heater when not connected to a properly installed and maintained venting system can
result in carbon monoxide (CO) poisoning and possible death.
P
RePaRation
F
oR
i
nstaLLation
:
• Remove the packaging from the appliance, and check to make sure there is no damage. If damage is
found, please report it to both the carrier and your dealer as soon as possible.
• Before beginning, carefully check the glass door and the log set
• Remove the stove top and carefully lay the unit down on its back and install the four steel legs using
the supplied hardware and a 3/8” wrench or socket (see Figure 15). Stand the stove up.
• Locate a position where the flue system of the stove can be properly installed without damaging the
integrity of the building; e.g. cutting a wall or ceiling joist.
• Check stove and flue system clearance requirements.
• Locate the stove where it can be accessed by a gas supply line.
• Locate the stove in a large and open room that is centrally located in the house. This will optimize heat
circulation and comfort.
• As the stove can be equipped with a convection fan, ensure that an electrical outlet is within 6 ft (1.8
m) of the stove.
• The flow of combustion and ventilation air must not be obstructed.
15
Steel Leg (x4)
Washer (x4)
1/4-20 Bolt (x4)
Figure 14: Leg Assembly
Summary of Contents for westport-steel
Page 46: ...Notes 46...