Using a ½" deep
socket remove/reinstall
the main burner orifice.
Undo the two
(2) screws that
hold burner in
the firebox.
Rotate handles
and remove the
door and glass.
Lift off the pilot
head and replace
with proper pilot
orifice for fuel type
to be used.
Venturi adjustment
bracket.
Pilot assembly moved
from firebox for clarity.
Figure 9: Unit burner shown apart.
Maintenance And Service
F
ueL
c
onveRsion
:
TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY
Please read and understand these instructions before installing.
valve upstream of the unit. CAUTION:
The gas supply must be shut off prior to
disconnecting the electrical power and
before proceeding with the conversion.
Allow the valve and unit to cool down to
room temperature.
2. Remove the door and fascia as shown in
the
M
aintenance
and
S
ervice
- G
laSS
d
oor
and
F
aScia
r
eMoval
.
3. Carefully remove the log set and ember
material if they are installed.
4.
Remove the burner as shown in the
M
aintenance
and
S
ervice
- b
urner
r
eMoval
.
5. Convert the burner orifice(s):
a) Remove the main burner orifice with a
½ inch deep socket.
b) Put a bead of pipe-thread sealant or
approved Teflon tape on the orifice
threads before installing into the brass
elbow.
c) Install the new orifice(s) from the kit
into the brass elbow.
Warning: This conversion kit shall be installed by a qualified service agency in accordance
with the manufacturer’s instructions and all applicable codes and requirements of the
authority having jurisdiction. If the information in these instructions is not followed
exactly, a fire, explosion or production of carbon monoxide may result causing property
damage, personal injury or loss of life. The qualified service agency is responsible for
the proper installation of this kit. The installation is not proper or complete until the
operation of the converted appliance is checked as specified in the manufacturer’s
instructions supplied with the kit.
Kit Parts List for all Westport models:
1 - Orifice (NG - #39 DMS or LP - #53 DMS
)
1 - Pilot Injector (NG 0.62 mm; LP 0.35 mm)
1 - Installation instruction sheet
1 - Conversion label
Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are
missing, contact your dealer, distributor or courier company to have them replaced before starting this
installation.
Conversion Kit Installation:
1. Turn control knob on the gas valve to the “OFF” position and shut the gas supply off at the shut-off
12
Summary of Contents for westport-steel
Page 46: ...Notes 46...