Initial Installation
QUALIFIED INSTALLERS ONLY
i
nsuLating
m
ateRiaL
:
Depending on the chosen vent configuration, either one or both pieces of insulating material supplied
with the unit are required for correct installation.
Rear Vent:
When using the rear vent configuration both the ceramic board and fiberglass insulation
are required. Place the ceramic board on top of the unit first and then place the insulation on top of the
ceramic board as shown in Figure 19.
Top Vent
: When using the top vent configuration only the figerglass insulation is required. Cut a notch
in the insulation, to fit around the vent collar, and place on top of the unit as shown in Figure 20.
Fiberglass
Insulation
Ceramic
Board
Figure 19. Unit Insulation - Rear Vent
Figure 20. Unit Insulation - Top Vent
Fiberglass
Insulation
(cut around
vent collar)
17
Summary of Contents for Nova Q1L
Page 43: ...43 Parts Diagram 21 2 4 3 5 13 16 15 14 11 9 12 8 7 6 18 17 19 20 1 10 22 24 23 ...
Page 44: ...Notes 44 ...
Page 45: ...Notes 45 ...