Initial Installation
QUALIFIED INSTALLERS ONLY
Figure 38A: Option 2
Option 4: Open Chase (built-out installations) -
This could be considered the most discreet option
when considering the CSS. The chase must be constructed in a way that stops short of the ceiling, leaving
it totally vented above. Minimum framing dimensions must be followed when constructing this option and
not to deviated from them when using combustible materials. Consider
Option 5: Valance
to work in
conjunction with this option.
2"
51mm
Minimum
6"
152mm
Minimum
Wall Mounted Object
2" MIN
Figure 38B: Open Chase Iso View
Option 3: Side Discharge (built-out installations) -
Construct the framing in a way that provides
a minimum 17
inch (432mm) by 2
1/2
inch (64mm) opening on each side of the chase. The top of the
opening must be 1 1/2” from the top of the chase (see Figures 37A & 37B)
Note: If you wish to construct the CSS air discharge part way up a tall wall then it is essential to build a
false ceiling inside the chase at the desired height to direct the rising heat out of the gap.
Figure 37B: Side Discharge Iso View
0 to 1
½”
[38mm] Maximum
17” [432mm]
2
½
” [64mm]
Figure 37A: Option 3 Side Discharge
Summary of Contents for G39GI