14
m
obiLe
h
ome
i
nstaLLation
:
• When the unit is installed in a Mobile Home
it must be grounded to the steel chassis or
connected to a grounding rod.
• In a Mobile Home installation the unit must
be bolted securely to the floor using the holes
provided (see Figure 17).
• Manufactured (mobile) home installation must
be in accordance with the Manufactured Home
Construction and Safety Standard, UL 307B,
Title 24 CFR, Part 3280 and/or The Standard for
Manufactured Home Installations, ANSI A225.1/
NFPA 501A
Holes for screws to
hold down the unit.
Figure 17: Screw the pedestal down for mobile homes.
c
oRneR
i
nstaLLations
:
Do not interfere with the structural integrity of
the walls.
Initial Installation
QUALIFIED INSTALLERS ONLY
Figure 16: Corner installation top vented.