STEP 6

 

Power supply wiring: cabling should be contained within 
conduit, and connected to PCB board as shown. 

STEP 7

 

Control panel wiring: The position of the control switch 
panel shall be decided and confirmed with client and/or 
main contractor. 

Cabling should be contained within conduit and 
controller connected to panel board with RVSP line 
as shown.

STEP 8

 

Installation of filter: Please note that the arrow on the 
filter is the direction of air flow as below. Filters should be 
installed after cleaning work has been completed on-site.

The reset button on the Controller should be pressed 
once the filters are installed to reset the maintenance 
schedule for the filters. Once reset, the Filter Life counter 
in the Notification Center under the speed display will say 
365 or 182 days to indicate a 12 or 6 month filter life. The 
HEPA filter should be replaced every 6 months when the 
UVC lamp is used and every 12 months if the UVC lamp 
is not used by removing the UVC lamps from the unit. If 
the filter life shows 182 days and you are operating the 
system without the UVC lamp, then one maintenance 
schedule can be skipped each cycle. The counter is hard-
coded to either 365 or 182 days.

NOTE:

 Filters should only be installed once the building is 

completely clean of construction debris and dust. 

HEPA filter 

must be removed from plastic before operating unit.

enVerid

 

Air Purifier Installation, Operation & Maintenance Guide

Summary of Contents for AP-W-120V-14W-2

Page 1: ...enverid com 1 enVerid Technical Documentation Air Purifier Installation Operation Maintenance Guide AUGUST 2021 V5 MODEL NUMBER AP W 120V 14W 2...

Page 2: ...e the following High voltage inside To reduce the risk of injury disconnect from power supply before servicing CAUTION To reduce the risk of injury to persons install purifier at least 8 feet 2 5 mete...

Page 3: ...ART ONE Air Purifier Installation Manual 4 PART TWO Air Purifier Operations Maintenance Guide 10 1 enVerid Air Purifier Installation View 2 enVerid Air Purifier Installation BOM List 3 enVerid Air Pur...

Page 4: ...ply Grille 3 8 Threaded Rod 3 8 Threaded Rod Floor Slab Ceiling Ceiling Air Puri er Ductwork Return Grille Duct Clamp Supply Di user Filter Access Door Control Box Air Mu er Box 3 8 Threaded Rod Blowe...

Page 5: ...3 8 Rubber Washer 8 Flexible collar 3 8 Expansion bolt NOTE Beam clamps may be used in case where air purifier is supported by building framing 8 x 60 NOTE For use in hard duct applications 20 x20 x1...

Page 6: ...y 1 Return Included in accessories bag Included in equipment body STEP 1 Open package and check parts documents Assemble angle bracket item 4 to unit item 1 as below STEP 2 Install expansion bolts and...

Page 7: ...silencers is suggested for flexible duct installations and 60 minimum for hard duct installations Both supply and return should be insulated or lined to dampen system sound Floor Slab Filters Silencin...

Page 8: ...ers are installed to reset the maintenance schedule for the filters Once reset the Filter Life counter in the Notification Center under the speed display will say 365 or 182 days to indicate a 12 or 6...

Page 9: ...enverid com 9 enVerid Air Purifier Installation Operation Maintenance Guide AIR PURIFIER WIRING DIAGRAM...

Page 10: ...of the filter On Off Increase air volume Decrease air volume Reset Short press to check the remaining days of the filter and long press for 10 seconds to reset counter Mode If the ECS control system...

Page 11: ...AC filters Contact your trash removal service to determine the appropriate disposal method for used UVC lamps Replacement parts can be ordered from the distributor who sold you the enVerid Air Purifie...

Reviews: