![enVerid AP-W-120V-14W-2 Installation, Operation, Maintenance Manual Download Page 5](http://html1.mh-extra.com/html/enverid/ap-w-120v-14w-2/ap-w-120v-14w-2_installation-operation-maintenance-manual_2415534005.webp)
enverid.com
5
2. enVerid Air Purifier Installation BOM List (not included in packaging)
NO.
1
5
11
3
9
7
13
2
6
12
4
10
8
14
IMAGE
NAME
Isolation Hangers
Suspension Rubber
Washer
Duct Collar
Expansion Bolt
Spiral Duct
Return Air Box
485 Communication
Wires
Hanging Bar
Return Air Grille
Power Line
Washer
Duct Clamp
Duct Silencer
Mccb Circuit Breaker
QTY.
4
4
3
4
2
1
Multiple
Multiple
1
Multiple
4
4
2
1
REMARK
TD-65lbs only for Purifier
3/8” Rubber Washer
8” Flexible collar
3/8” Expansion bolt
NOTE: Beam clamps may be used in case where
air purifier is supported by building framing.
8” x 60”
NOTE: For use in hard duct applications.
20”x20”x14” – 1” liner for
sound attenuation or confirm on site
18 gauge, 2 wire, stranded and shielded wire
3/8” Threaded Rod
20”x20” minimum or to be confirmed by PM
See power requirements and local code
3/8” Fender Washer
8” Duct Clamp
8” x 40”
NOTE: For use with flexible duct for sound attenuation.
MOCP 15 Amp – Do not exceed code requirements
and guidelines for number of units per circuit
enVerid
Air Purifier Installation, Operation & Maintenance Guide