envea CAIRNET V2 2G/3G General User Manual Download Page 13

 

   

 

 

 

P092D.ABD.CAIRNETGPRS-V2-UserGuide.121018-EN

 

 
 

ENVEA - 111, Bd Robespierre 

– CS 80004 – 78304 Poissy Cedex 4 – France 

Tel.: +33 (0)1 39 22 38 00 

– Fax: +33 (0)1 39 65 38 08 

[email protected]

 / 

http://www.cairpol.com

 

 

 

To optimize the ability to recharge the battery, it is strongly recommended to orient the solar panel due SOUTH for 
countries in the North of the equator and due NORTH for countries in the South of the equator. 
 
Indicatively the recommended elevation angle is: 
 

 

From April to October: 25° 

 

From October to April: 45 ° 

 

 

Picture 5: Elevation angle setting. 

 
Minimum requirements of sun exposure on solar panel allowing an optimal charging of the battery: 

 

Solar power on the solar panel surface has to average 340 W / m2 (Irradiance G). 

 

Minimum daily period of sunshine: 5 hours. 

More information are available on the websit

http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php

 

 
If this conditions are not met, the operation of the system can be degraded and losses of data can occur. 
 

5.4

 

Some precautions to take care 

The following check must be done before any use of the Cairnet: 

 

 

The free air around the Cairnet when mounted on its support.

 

 

The antenna must be oriented towards the sky and barrier-free nearby.

 

 

The connector and the inlet sample of the Cairsens must be pointing downwards.

 

 

The sensor is positioned in its socket so both its air outputs on the sides aren’t obstructed.

 

 

The solar panel or main power supply must be connected to the.

 

 
 

Summary of Contents for CAIRNET V2 2G/3G

Page 1: ...NETGPRS V2 UserGuide 121018 EN ENVEA 111 Bd Robespierre CS 80004 78304 Poissy Cedex 4 France Tel 33 0 1 39 22 38 00 Fax 33 0 1 39 65 38 08 support cairpol com http www cairpol com CAIRNET V2 2G 3G GENERAL USER GUIDE ...

Page 2: ..._6 3 3 Environmental conditions _______________________________________________________________7 3 4 Size and Weight _______________________________________________________________________7 4 TECHNICAL CHARACTERISTICS _________________________________________________________8 4 1 General information ___________________________________________________________________8 4 2 Technical characteristics ...

Page 3: ...t OPTION1 CAIRCLOUD Software o Web interface accessible from anywhere and with several support PC tablet or smartphone o Private and Secure Web access to the Cloud o Management interface of Cairsens lifetime stay references names o View interface of measures in real time on dynamic map and curves format o View interface of Manage Cairnet with technical data Temperature Humidity and battery and pow...

Page 4: ...ng is designed to create a network of remote measurement points for diffuse emissions of odorous gases autonomous in energy and in data transmission management Picture 1 View and presentation of the Cairnet system Cairnet BOX Photovoltaic System Antenna Mounting Kits POWER ON OFF Power management communication with sensors Board PM and technical data management SPM Board Sensors Location Power bat...

Page 5: ...figurations files in the FTP server useful for the functioning of Cairnet In the over side the Cairnet reads theses files and then each 10 minutes by default write the measurements files coded on this same FTP server that the Caircloud picks every 15 minutes Once activated the exchange procedure between the 3 entities is as follow The Cairnet every 10 minutes a Access to the time server by an inte...

Page 6: ...tom of the box must be connect to a power supply source outdoor main power supply or solar panels optional or indoor main power supply provided with the Cairnet Depending on the use 2 types of power supply source can be used Operating mode Solar Panel Power supply Indoor or outdoor 2 X 13 5W _ VCO 10 5V ICC 1 6 A Optimal conditions 115 230VAC _ 50 60Hz 7 to 12 VDC _1 5A Overload protection and ove...

Page 7: ...90 WARNING The use of Cairnet and all its associated components in a corrosive and saline environment marine ambient air or close to any source of corrosion emission output composed of ammonia and chlorine for example is not recommended ENVEA CAIRPOL will be not be held responsible for any degradation resulting from use under these conditions 3 4 Size and Weight Cairnet Box Solar panels With its f...

Page 8: ...analysed among various features Picture 2 The operating principle of the Cairnet nnetwork As a reminder the Cairnet network consists of CAIRNET 2G 3G set including 1 protective housing including the battery and the 2G 3G communication module Optional 1 photovoltaic panels kit 2 solar panels fixation kit 1 to 4 sensors UART Cairsens depending of the order 1 indoor power supply 115 230VAC 50 60Hz 12...

Page 9: ...rmissible diameter of the mast is 40mm 4 3 Technical characteristics of photovoltaic system The photovoltaics panels kit is fixed on the same supports as Cairnet or other support It is adjustable from 0 to 90 with regards to the vertical line The Azimuth angle is obtained by rotating the entire system on the mast The maximum permissible diameter of the mast is 40mm This system is then easy to conn...

Page 10: ... modem are 3G 2G AirPrime HL8548 module of manufacturer Sierra Wireless compliant with the following regulations o R TTE directive 1999 5 EC o Japan JRF JPA o FCC o IC Technology Frequency bands supported o Quad band GSM 2G EDGE 850 MHz 900 MHz 1800 MHz 1900 MHz o Hexa band UMTS WCDMA FDD 800 MHz B19 850 MHz B5 B6 900MHz B8 1900 MHz B2 2100MHz B1 o Accommodates multiple radio technologies from 2G ...

Page 11: ... card Setup and fill useful information for M2M SIM card APN User and Password Start the Cairnet Close the Box The 1st transmission of the data by the Cairnet to the Caircloud will be done 5 to 30 minutes after the start Deploy the Cairnet on their final location Connect Power Supply Solar panels or main power to the Cairnet When the network is installed and ready to be used a conditioning period ...

Page 12: ...hotovoltaic panel s kit refer to document P0116A ABD SYS FIX PVD06 0053 A P10 2220 A 231115 Be careful that the positioning of the voltaic system does not alter the sampling from the bottom of the Cairnet and that is not too close to the antenna Picture 4 Example of assembling Cairnet and Photovoltaic system on the mast Solar panel Fixation Solar Panels Output connector Cairsens sensors are inside...

Page 13: ...timal charging of the battery Solar power on the solar panel surface has to average 340 W m2 Irradiance G Minimum daily period of sunshine 5 hours More information are available on the website http re jrc ec europa eu pvgis apps4 pvest php If this conditions are not met the operation of the system can be degraded and losses of data can occur 5 4 Some precautions to take care The following check mu...

Reviews: