9033644
Installation 17
2. INSTALLATION
Inspecting Your Shipment
When you receive the shipment of your switch, check the package
contents and make sure you have the following items:
•
VH-2402S stackable switch
•
Mounting ears and mounting screws
•
Four rubber feet
•
ESD wrist strap
•
Power cord
•
Product documentation
Site Requirements
Before you install the switch, make sure the site meets the following
requirements:
•
Mounting
Provide a flat table, shelf surface, or an optional 19 in. (48.3 cm)
equipment rack.
Use an EIA standard equipment rack that is grounded and physically
secure.
•
Power source
Provide a power source within six feet (1.8 m) of the installation
location. This source must provide 100 VAC to 240 VAC, at 50 Hz to
60 Hz, for 80 VA minimum power. Power specifications for the switch
are shown in Appendix A, “Technical Specifications.
One 32 cm stack interconnection cable is included with
every optional Stacking Module. The 32 cm cable
(9380142) can also be ordered separately, if required.
Primary voltage selection within the above ranges is
automatic and requires no user action.
Summary of Contents for Vertical Horizon VH-2402S
Page 1: ...9033644 Vertical Horizon VH 2402S FAST ETHERNET SWITCH USER GUIDE...
Page 2: ......
Page 10: ...Notice viii 9033644...
Page 50: ...36 Flow Control VH 2402S...
Page 56: ...4 Index VH 2402S...
Page 57: ......
Page 58: ...150xxx 102 R01...