SecureStack B2 Installation Guide 3-1
3
Hardware Installation
This
chapter
provides
instructions
to
install
the
B2G124
‐
24,
B2G124
‐
48,
and
B2H124
‐
48.
Unless
otherwise
noted,
the
instructions
apply
to
all
switches.
Follow
the
order
of
the
sections
listed
below
to
correctly
install
the
switch.
Electrical Hazard:
Only qualified personnel should perform installation procedures.
Riesgo Electrico:
Solamente personal calificado debe realizar procedimientos de
instalacion.
Elektrischer Gefahrenhinweis:
Installationen sollten nur durch ausgebildetes und
qualifiziertes Personal vorgenommen werden.
Important Notice
Read the Release Notes shipped with the switch to check for any exceptions to the supported
features and operation documented in this guide.
For information about...
Refer to page...
Considerations Prior to Installation
3-2
Required Tools
3-2
Unpacking the Switch
3-2
Installing Optional Mini-GBICs
3-3
Installing the Switch on a Flat Surface
3-6
Connecting High-Speed Stacking Cables
3-10
Configuring Switches in a Stack
3-12
Connecting AC and RPS-SYS Power
3-15
Connecting to Console Port for Local Management
3-18
Connecting to the Network
3-22
Completing the Installation
3-31
Summary of Contents for Enterasys SecureStack B2 B2G124-24
Page 2: ......
Page 12: ...x...
Page 16: ...xiv...
Page 20: ...Conventions Used in This Guide xviii About This Guide...
Page 62: ...Completing the Installation 3 32 Hardware Installation...