ensto Chago eFill EVH020.01 Installation And Operation Instructions Manual Download Page 5

5

RAK93 / © Ensto 2018

• 

Remove the stainless steel top cover by removing the four torx screws.

• 

Take the cable routing into consideration when planning the installation. The supply cable can 

be routed into the enclosure from the rear or bottom. Install the lead through plate depending 

on the cable entry direction.

• 

Prepare the wall for installation and select the screw type depending on the wall type. Recom-

mended screw diameter is 6mm - 8mm. The mounting screw spacing is 120mm x 185mm. Ex-

ercise extreme caution when drilling holes in the wall. Make sure there are no electrical cables 

inside the wall. 

• 

Select the drill size to match the screw size. 

• 

Drill open the mounting hole points in the back of the aluminum enclosure. 

• 

Install the aluminum enclosure to the wall. 

• 

Place rubber washers between the wall and the enclosure.

Supply Connection EVH020.01 and EVH020.02 / EVH050.02

NOTE! The installation must be done by a qualified person e.g. an electrician.

The supply cable routing must be proper. Ensure the sufficient supply cable sizes in the installation.

No additional loads in the same supply line.
See figure 3.
• 

Pull the supply cable through the cable lead through plate 350mm - 400mm measured from 

the lead through. 

• 

Remove the sheath of the supply cable at the length of max. 250mm. 

• 

Cut the leads in different lengths so that the PE cable is the longest and strip them at the 

length of 23mm. 

• 

Connect the supply cable leads to the supply connectors according to the connection dia-

gram.  Ensure strain relief to the cables by fastening it on the cable support that is located 

under the supply connectors. 

• 

In case of an eFill with a pushbutton, connect the cable of the pushbutton according to the 

connection diagram.

IMPORTANT NOTICE: eFill needs to be installed to a dedicated supply line, which is equipped with 

30mA residual current device (RCD) and 16A circuit breaker (MCB).

Figure 3

Summary of Contents for Chago eFill EVH020.01

Page 1: ...RAK 93 18 5 2018 Ensto 2018 Chago eFill ENG Installation instructions Operation instructions...

Page 2: ...EVH050 02R16 3 EVH020 01 and EVH020 02 EVH050 02 4 Supply Connection EVH020 01 and EVH020 02 EVH050 02 5 Charging Current Limitation 7 Top Cover Installation 8 Plug Holder Installation 8 User Instruct...

Page 3: ...ed Ratchet wrench set Torx key set Power drill with bore bit Screws and possible accessories for wall installation Before Installation Remove the eFill from it s package Do not to scratch the surface...

Page 4: ...t match charging current setting in eFill See table on page 7 When the light turns green the charging point is ready for use EVH020 01 and EVH020 02 EVH050 02 NOTE The installation must be done by a q...

Page 5: ...EVH020 01 and EVH020 02 EVH050 02 NOTE The installation must be done by a qualified person e g an electrician The supply cable routing must be proper Ensure the sufficient supply cable sizes in the i...

Page 6: ...N L1 PE PP X1 16A L2 L3 1 2 3 4 EVH020 01 EVH020 02 SUPPLY 1 x 16A 230V max 6mm Cu 30mA RCD and 16A MCB SUPPLY 1 x 16A 230V max 6mm Cu 30mA RCD and 16A MCB PG ProximityGround CP ControlPilot PG Proxi...

Page 7: ...ging current OFF OFF OFF OFF OFF OFF 6A ON OFF OFF OFF OFF OFF 8A EVH020 01R EVH020 02R default OFF ON OFF OFF OFF OFF 10A ON ON OFF OFF OFF OFF 12A OFF OFF ON OFF OFF OFF 14A ON OFF ON OFF OFF OFF 16...

Page 8: ...ng point is ready to use for charging Plug Holder Installation Install the plug holder to a wall so that the plug is handy to pick up and the placement is practical com pared to location of the parked...

Page 9: ...oint No light Troubleshooting The vehicle is not charging Ensure that the charging cable is properly connected to the vehicle Ensure from the vehicle that the vehicle has no timer charging activated I...

Page 10: ...ll the order num ber V You will find the order number on the nameplate on the enclosure bottom Maintenance Instructions With well done maintenance you can ensure a long lifetime of the charging point...

Page 11: ...11 RAK93 Ensto 2018 Dimension Drawing 432 363 200 220 168 495 140 432 363 220 200 168 1500 EVH020 01 EVH020 02 EVH050 02 EVH020 01R EVH020 01R16 and EVH020 02R EVH020 02R16 EVH050 02R16...

Page 12: ...gconnectors 1 Chargingcurrentmax 16A1 phase 3x16A 3 phase 8A1 phase 16A1 phase 3x16A3 phase Chargingoutput 3 6kW 11kW 3 6kW 11kW Nominalvoltage 230V1 phase 230V 400V 3 phase 230V1 phase 230V 400V 3 ph...