Remove the stainless steel top cover by removing the four torx screws.
•
Take the cable routing into consideration when planning the installation. The supply cable can
be routed into the enclosure from the rear or bottom. Install the lead through plate depending
on the cable entry direction.
•
Prepare the wall for installation and select the screw type depending on the wall type. Recom-
mended screw diameter is 6mm - 8mm. The mounting screw spacing is 120mm x 185mm. Ex-
ercise extreme caution when drilling holes in the wall. Make sure there are no electrical cables
inside the wall.
•
Select the drill size to match the screw size.
•
Drill open the mounting hole points in the back of the aluminum enclosure.
•
Install the aluminum enclosure to the wall.
•
Place rubber washers between the wall and the enclosure.
Supply Connection EVH020.01 and EVH020.02 / EVH050.02
NOTE! The installation must be done by a qualified person e.g. an electrician.
The supply cable routing must be proper. Ensure the sufficient supply cable sizes in the installation.
No additional loads in the same supply line.
See figure 3.
•
Pull the supply cable through the cable lead through plate 350mm - 400mm measured from
the lead through.
•
Remove the sheath of the supply cable at the length of max. 250mm.
•
Cut the leads in different lengths so that the PE cable is the longest and strip them at the
length of 23mm.
•
Connect the supply cable leads to the supply connectors according to the connection dia-
gram. Ensure strain relief to the cables by fastening it on the cable support that is located
under the supply connectors.
•
In case of an eFill with a pushbutton, connect the cable of the pushbutton according to the
connection diagram.
IMPORTANT NOTICE: eFill needs to be installed to a dedicated supply line, which is equipped with
30mA residual current device (RCD) and 16A circuit breaker (MCB).