PREPARATION

A )  Inspect the packaging and the Encharge Battery(ies) for damage, such 

as cracks, dents, or leaking electrolyte. 

Do not install or use the Encharge 

Battery(ies) if it has been damaged in any way

. If damaged, contact your 

distributor for replacement.

B )  Ensure that your kit includes the following Encharge components:

• 

The 

Encharge 10

 includes three batteries and two inter-unit raceways, 

an Encharge 10 triple-width cover, and a triple-width mounting bracket.

• 

The 

Encharge 3

 includes one battery, and single-width cover with 

mounting bracket. 

NOTE

: Check the “Energize By” label on the shipping box to verify that 

the Encharge Battery(ies) will be installed by the date shown. If the date 

has passed, contact your distributor for next steps.

WARNING

: Risk of injury. Take care when lifting. The Encharge 

Battery unit is heavy (44.2 kg/ 97.4 lbs) and requires two persons to lift.

C )  Ensure you have the following 

required Enphase items for backup systems

:

• 

An Enphase Enpower smart switch with microgrid interconnect device 

(MID) functionality and an Enphase IQ™ Combiner.

• 

The Enphase Encharge system requires an Internet connection 

through the IQ Envoy in the IQ Combiner. Failure to maintain an 

Internet connection may have an impact on the warranty. See 

enphase.com/warranty

 for full terms.

• 

Wireless communications kit (COMMS-KIT-01) to be installed at the IQ 

Envoy for communications with Encharge and Enpower. Includes USB 

cable for connection to IQ Envoy / IQ Combiner and allows redundant 

wireless communication with Encharge and Enpower.

• 

Encharge lifting handles, two pieces (ENCHARGE-HNDL-R1). 

D )  Make sure you also have the following 

required items

:

• 

Mounting location that is structurally suited to bearing the weight of 

the Encharge Battery(ies). Total weight for the Encharge 3, including 

the Encharge base unit, cover and wall mount bracket, is 52 kg (114.6 

lbs). Total weight for the Encharge 10, including the three Encharge 

base units, cover, and wall mount bracket, is 154.7 kg (341 lbs).The 

wall must contain blocked studs that can bear the battery weight or 

can be of masonry or other suitable structure.

• 

Tools: conduit (with fittings and fitting tools), drill, 5/32 inch pilot bit 

(or metric equivalent), screwdriver, socket wrench, torque wrench, 

level, wire stripper, and stud finder if installing on studs.

• 

Fasteners for wall mount bracket. Check with a structural engineer 

and local standards for requirements.:

  Three #10 lag bolts or screws, 7.6 cm (3 inches) long (depending 

on attachment wall), for each single-wide wall-mount bracket. 

  Nine #10 lag bolts or screws, 7.6 cm (3 inches) long (depending on 

attachment wall), for each triple-wide wall-mount bracket. 

• 

Washers for use between fastener heads and wall-mount bracket.

• 

Copper conductors: No. 12 - 8 AWG

 

(11mm/7/16 inch strip length) 

copper conductors (rated at 75° C or 90° C) for terminals.

• 

Conduit fittings: 3/4 inch (left side) and 1/2 inch (right side) hubs 

are required for all installations, and NEMA Type 3R conduit fittings 

(hubs) are needed when installing out of doors (one for each used 

conduit opening). Also needed are conduit plugs to close unused 

conduit openings and conduit grounding nuts.

• 

Over current protection: The overcurrent protection in Encharge is not 

branch circuit overcurrent protection and cannot be relied upon for that 

purpose. The branch circuit overcurrent protection is located in Enpower 

or, when combining , in a separate combiner. See the Enphase Enpower 

Quick Install Guide for more information.

• 

Personal protective equipment (PPE) for handling lithium batteries 

as required by local safety standards.

E )  Verify that main service is 120/240 VAC, and not 208/120 VAC. 

Encharge batteries cannot be installed where L1 to L2 measures 208 

VAC. 

F )  Install the PV system and the IQ Combiner as directed by the Enphase 

installation manuals. 

Enlighten Cloud
Tertiary control, API interface, 

over-the-air firmware upgrade

WiFi/Cellular

Main 

Load Panel

Power Line 

Communication

Encharge 10™/

Encharge 3™

storage system

IQ 6™/IQ 7™

M

IQ™ Combiner

Home Loads

Wireless

Self consumption, no Enpower smart 

switch. 

The preferred configuration when 

adding battery storage and PV for self-

consumption in a grid-tied application with 

no option for backup during outages. PV 

and Encharge will not operate when the grid 

is unavailable.

Enlighten Cloud
Tertiary control, API interface, 

over-the-air firmware upgrade

WiFi/Cellular

Wireless

Main 

Load Panel

Power Line 

Communication

Encharge 10™/

Encharge 3™

storage system

Generator

(Future)

Other Loads

Backup Loads

Backup

Sub-Panel

IQ 6™/IQ 7™

M

IQ™ Combiner

Enpower™

smart switch

Wireless

Partial home backup with main load panel 

as service entrance and PV combiner 

connected to sub-panel. 

This is the 

preferred connection configuration for 

partial home backup using a subpanel when 

the PV circuit breaker size is more than 

80A. The space available in Enpower for 

combiner (solar) connection is left vacant.

P R 

E L 

I M

Summary of Contents for ENCHARGE Series

Page 1: ... 10 Encharge 3 storage system Generator Future IQ 6 IQ 7 M IQ Combiner Enpower smart switch Home Loads Main Load Panel Wireless Whole home backup with Enpower as service entrance and PV combiner connected to Enpower This is the preferred configuration for back up of the entire main load panel This configuration supports up to an 80A breaker for the PV circuit and an 80A breaker for battery storage...

Page 2: ... structural engineer and local standards for requirements Three 10 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall for each single wide wall mount bracket Nine 10 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall for each triple wide wall mount bracket Washers for use between fastener heads and wall mount bracket Copper conductors No 12 8 AWG 11mm 7 16 inc...

Page 3: ...mbiner for grid tied only installations You must select proper conductors and AC discon nects for these circuits according to local codes standards and other applicable requirements Enpower supports up to a maximum of 80 A breaker for Encharge connection circuit The subpanel could be a small two circuit box with circuit breakers the drawing only shows switches The circuit breakers in the box would...

Page 4: ... to the wall so that it is no more than five percent from vertical See the following image for reference Encharge 10 triple width bracket A Place the wall mount bracket on the wall so that the mounting holes in the middle of the bracket align with the center of the stud and the mounting holes on the left and right align with the adjacent studs B Use a level to keep the bottom of the wall mount bra...

Page 5: ...Together lift the Encharge battery and bring it to the already mounted bracket G Hold the Encharge battery at an angle so the top of the unit sets into the top of the wall mount bracket WARNING Risk of injury and equipment damage Do not release the Encharge battery unit until you ensure that the Encharge battery unit is fully seated in the wall mount bracket shelf H Once the top of the battery is ...

Page 6: ...onduit opening has a groove around the hole to fit the O ring red of the raceway Make sure that the O ring is captured in the groove between the Encharge enclosure and the raceway flange adjacent to the O ring 6 Install conduit and field wiring continued E Using the conductors and suitable conduits connect the AC disconnect and the first adjacent Encharge Battery Use the conduit openings provided ...

Page 7: ...ol kit help topics for more information After the IQ Envoy has detected the Encharge Battery ies the Encharge LEDs operate as described in the following section CONFIGURE and ACTIVATE OPERATION a LED overview After being commissioned the LED flashes yellow while each Encharge Battery boots up If the LED rapidly flashes green for more than two minutes the battery is in trickle charge mode and will ...

Page 8: ...ncharge Battery ies in storage ensure that AC power is not present and that the DC switch is in the Locked position While in storage damage to the battery can occur from over discharge If the battery state of charge falls to 0 the Encharge Battery ies can be damaged or destroyed Because of this the Encharge Battery ies must only be stored for a limited amount of time The Encharge Battery ies must ...

Reviews: