enphase BRK-100A-2P-240V Quick Install Manual Download Page 7

PCS CT installation within IQ System Controller 2

IQ Gateway Terminal Block

Relay contacts

(if needed)

whit

e

blue

Not used    

whit

e

blue

Consumption CTs

The arrows must point 

toward the load, away 

from the grid.

P1

C1 C2

1

2

3

4

NO

 Ref

Common

C

Digital Input

Relay

PD, B300

OVC II

 

L1

L2

N

CU, 75C, 14AWG MIN

MEAS CAT III

OVC III

Production  |  Consumption

      

Set Up the Power Control System (continued)

6

F )   For Production as well as Consumption/PCS CTs, you must apply the 

following label to each CT when the system is configured to use PCS-based 

current limiting. 

 

The available space on the CTs for labeling is as follows. 
Consumption/PCS CT (CT-200-SPLIT):

•  Left side: 20mm(vertical) x 14mm(Horizontal)
•  Back side: 20mm (vertical) x 20mm(Horizontal)

Production CT (CT-200-SOLID):

•  9mm(vertical) x 30mm(horizontal)

This sensor is part of a Power Control System. Do not re-

move or disable. Replace with same type and rating.

NOTE

: The maximum operating currents in controlled busbars or 

conductors are limited by the settings of the Power Control System 

(PCS) and may be lower than the sum of the currents of the connected 

controlled power sources. The settings of the PCS controlled currents 

may be used for calculation of the design currents used in the relevant 

sections of NEC Article 690 and 705.

*

 

WARNING! 

Risk 

of electric shock and fire. Only qualified personnel 

are permitted to set or change the setting of the maximum operating 

current of the PCS.  The maximum PCS operating current setting shall 

not exceed the busbar rating or conductor ampacity of any PCS con-

trolled busbar or conductor.

Summary of Contents for BRK-100A-2P-240V

Page 1: ...roviding a consistent pre wired solution for residential applications Along with MID functions it includes PV storage and generator input circuits 2021 Enphase Energy All rights reserved Enphase the Enphase logo IQ System Controller 2 IQ Battery IQ Gateway IQ combiner IQ microinverter Enphase App and other trademarks or service names are the trademarks of Enphase Energy Inc Data subject to change ...

Page 2: ... for local requirements Washers for use between fastener heads and wall mount bracket Conductors rated at 75 C For sizes refer to the table on the unit and to local codes Over current protection maximum in accordance with local standards The door sheet metal is not required to be grounded since it is pro tected from live parts by other grounded metal and insulating plastic materials thus is consid...

Page 3: ...w engages with the hole in the bracket to prevent vertical movement of the bracket WARNING Risk of injury and equipment damage Do not skip this step Without these screws in place the IQ System Controller 2 may fall and cause injury or damage if bumped or shaken K Use the four filler plates provided in the lit kit to cover the screws IQ System Controller 2 Wall Mount Bracket Align with stud Bracket...

Page 4: ...tem Controller and insert quad breaker BRK 20A40A 4P 240V in the NFT position wire L1 and L2 from IQ Gateway terminals through the PV conduit to IQ System Controller wire IQ Gateway L1 and L2 and NFT L1 and L2 to the quad breaker Generator breaker position is free to be used with generator J The bottom right breaker position can be used for the below purposes 1 Power the IQ Gateway 2 Interconnect ...

Page 5: ...DING ELECTRODE TERMINAL adjacent to the grounding bar From the lit kit place the label SUITABLE FOR USE AS SERVICE EQUIPMENT MAIN SERVICE DISCONNECT on the deadfront near the main breaker service disconnect If IQ System Controller 2 is not used as service equipment these labels should not be used E Connect Lines Neutral and Ground For details refer to the conductor table on the unit for sizes and ...

Page 6: ...e service entrance of the the system controller The arrows on the Consump tion PCS CT must point towards the loads towards the busbar inside the IQ System Controller 2 Refer to the image on the next page for the Consumption PCS CT location and wiring to the IQ Gateway D You must protect all PCS controlled busbars and or conductors with suitably rated overcurrent devices that are appropriately size...

Page 7: ...al Back side 20mm vertical x 20mm Horizontal Production CT CT 200 SOLID 9mm vertical x 30mm horizontal This sensor is part of a Power Control System Do not re move or disable Replace with same type and rating NOTE The maximum operating currents in controlled busbars or conductors are limited by the settings of the Power Control System PCS and may be lower than the sum of the currents of the connec...

Page 8: ... is for connecting with a remote RSD switch It has two normal ly close auxiliary contacts NC3 NC4 and each auxiliary contact has two terminals Gen I O has one normally open auxiliary contact NO3 for generator control and this contact has three terminals All the auxiliary contact relays are rated for pilot duty at 24Vac Vdc nomi nal and 1 Amp A Auxiliary Contact connections for shedding excess PV a...

Page 9: ...s to secure the headers to IQ System Controller 2 as shown in Feed through headers for I O 1 and I O 2 image 1 Insert the wires from the transformer controller and the external contactor into the feed through header NOTE Supports AWG 28 to AWG 16 wire sizes 2 Tighten the screws on the top torque 0 22Nm to 0 25Nm to secure the wires Follow same procedure for generator dry contact connections There ...

Page 10: ...of generator CTs CT 200 SPLIT for L1 and L2 at the IQ System Controller 2 s Generator input terminal for power monitoring when the generator is running Detailed CT wiring is described in step 9 G Use Enphase Installer App mobile application to commission and pro gram IQ System Controller 2 to control the generator H For 2 wire autostart generators wire the Generator I O port in IQ System Controlle...

Page 11: ...he arrow on the CT pointing towards the Generator breaker D Clamp the unmarked CT on Line 2 of the generator branch circuit inside the IQ System Controller 2 box with the arrow pointing towards the Generator breaker E Bring the CT lead wires out of IQ System Controller 2 to the standalone IQ Gateway or IQ Gateway in the IQ Combiner box F Use a screwdriver to loosen the screw on the IQ Gateway term...

Page 12: ... to meet warranty requirements the IQ System Controller 2 must be installed and or stored according to the instructions in this guide NOTE The IQ System Controller 2 is compatible only with the IQ Combiner 4 4C fitted with USB hub USB radios and production and Consumption PCS CTs The IQ Combiner with the IQ Gateway inside is required for operation of the IQ System Controller 2 Earlier versions of ...