enphase BRK-100A-2P-240V Quick Install Manual Download Page 5

I/O - 1

(24V, 1A)

I/O - 2 

(24V, 1A)

Gen - I/O

(24V, 1A)

NO1 NO2

NC1 NC2

NO3

RSD 

NC3 NC4

AC Combiner 

PV/Storage

Generator

Control PCBA & cover

Breaker spaces for auto 

transformer, generator, 

AC Combiner and 

Encharge circuits

Eaton breaker 

CSR2100N/2150N/200N

Two general purpose 

relay I/O

A: Up to 80A to PV Combiner

B: Up to 80A to Encharge

C: Up to 200A to backup load panel

D: Up to 80A to generator 

A B C

D

From utility meter or 

main load panel

AC power wire

Generator I/O

Ground

Neutral

Main service disconnect

Eaton breaker

CSR2100N/2150N/22000N

200A main MID relay

5

Conduit guidance - 

bottom entry

Conduit guidance - 

side entry

       Wire the field connections and the rapid shutdown (RSD) 
       switch

+

 

DANGER! 

Risk of electric shock. Check that all circuits connecting to the IQ 

System Controller 2 are de-energized before wiring.

*

 

WARNING!

 

Do not install consumption CTs on the conductors above the 

common busbar or on the main conductors below the main breaker if the 

main breaker is used as service entrance. If the main breaker is the service 

entrance breaker, You must install the CTs on the conductors near the service 

entrance of system controller.

A )  Drill conduit entry holes as needed, and install conduit grounding lugs for each 

opening. Be sure to reseal unused conduit entry holes with sealing plugs. 

 NOTE

: Main supply conductors may enter the IQ System Controller 2 from the 

bottom or from the bottom-left side. Backup load conductors may enter the 

IQ System Controller 2 from the bottom or bottom-right side. IQ Battery, IQ 

Combiner and generator conductors may enter from the bottom, bottom-left or 

bottom-right sides.

B )  Size the conductors (Line, Neutral and Ground) depending on the breaker or 

fuse, proper ampacity, and voltage rise requirements according to local codes. 

Refer to the conductor rating table on the door of the IQ System Controller 2.

C )  If the IQ System Controller 2 is not installed as service equipment

1

, you must 

remove the main bonding jumper connected between the grounding bar and the 

neutral assembly. Refer to the wiring diagram.

 

NOTE: 

Do not modify or rewire any of the other pre-installed wiring or bonding 

connections in the IQ System Controller 2. 

D )  If IQ System Controller 2 is installed as service equipment

1

:

• 

Connect a grounding electrode conductor to the grounding bar.

• 

From the lit kit, place the label “GROUNDING ELECTRODE TERMINAL” adjacent 

to the grounding bar.

• 

From the lit kit, place the label “SUITABLE FOR USE AS SERVICE EQUIPMENT” 

/ “MAIN SERVICE DISCONNECT” on the deadfront near the main breaker/

service disconnect.

• 

If IQ System Controller 2 is not used as service equipment, these labels should 

not be used.

E )  Connect Lines, Neutral, and Ground. 

For details, refer to the conductor table on 

the unit for sizes and refer to local codes.

*

 

WARNING! 

Risk of equipment damage. Always connect to two Lines (ac-

tive), one neutral, and one ground. 

F )  Connect the AC wires of Enphase IQ Combiner, IQ batteries, and generator into 

the terminal lugs at the bottom of the IQ System Controller load center on the 

left. 

  *

 

WARNING!

 

Do not connect the AC wires directly into the breakers. The AC 

wires go into the terminal lugs as shown in the label.  

G )

  Rapid shutdown (RSD) switch connections 

 

To conduct IQ8 PV rapid shutdown, a double pole single throw 

lockable RSD switch is required. The RSD switch should be 

placed in a readily accessible location outdoor and wired to IQ 

System Controller. The maximum distance between the RSD 

swtich and IQ System Controller is 200 feet. The RSD port in 

IQ System Controller 2 accepts 28AWG to 16AWG wire sizes. 

For RSD switch that supports only higher gauge wire sizes 

(e.g. 12AWG), the cable assy header included in the IQ System 

Controller 2 Lit Kit is required.  

       To connect the RSD switch with the IQ System Controller RSD 

port, wire the L1 and L2 of one pole of the RSD switch to the 

two terminals of NC3 in IQ System Controller, and wire the L1 

and L2 of the other pole of the RSD switch to the two terminals 

of NC4 in IQ System Controller. 

       To convert the RSD switch 12AWG wires to 16 AWG wires, 

connect the RSD wires first to the cable assy headers from the 

IQ System Controller lit kit, and then connect the 16AWG wires 

on the header to NC3 and NC4 in IQ System Controller. 

H )  After all conductors are connected and secured, check that 

there are no exposed conductors or stray wires. 

I )  Gently arrange all the conductors and connectors inside the 

cabinet.

DANGER!

 Risk of electric shock. The system is not ready 

to be energized! Do not close any circuit breaker yet. 

NOTE

:  The polarity of L1 and L2 is swapped inside Eaton CSR 

series main breakers. Installers should follow L1 and L2 on the 

following image when installing consumption CTs.

*The extra lug near the top right side of NFT (auto transformer) is a 

manufacturing test terminal intentionally unpopulated with no end user 

application.

Cable Header  

Assembly

12 AWG wires

Summary of Contents for BRK-100A-2P-240V

Page 1: ...roviding a consistent pre wired solution for residential applications Along with MID functions it includes PV storage and generator input circuits 2021 Enphase Energy All rights reserved Enphase the Enphase logo IQ System Controller 2 IQ Battery IQ Gateway IQ combiner IQ microinverter Enphase App and other trademarks or service names are the trademarks of Enphase Energy Inc Data subject to change ...

Page 2: ... for local requirements Washers for use between fastener heads and wall mount bracket Conductors rated at 75 C For sizes refer to the table on the unit and to local codes Over current protection maximum in accordance with local standards The door sheet metal is not required to be grounded since it is pro tected from live parts by other grounded metal and insulating plastic materials thus is consid...

Page 3: ...w engages with the hole in the bracket to prevent vertical movement of the bracket WARNING Risk of injury and equipment damage Do not skip this step Without these screws in place the IQ System Controller 2 may fall and cause injury or damage if bumped or shaken K Use the four filler plates provided in the lit kit to cover the screws IQ System Controller 2 Wall Mount Bracket Align with stud Bracket...

Page 4: ...tem Controller and insert quad breaker BRK 20A40A 4P 240V in the NFT position wire L1 and L2 from IQ Gateway terminals through the PV conduit to IQ System Controller wire IQ Gateway L1 and L2 and NFT L1 and L2 to the quad breaker Generator breaker position is free to be used with generator J The bottom right breaker position can be used for the below purposes 1 Power the IQ Gateway 2 Interconnect ...

Page 5: ...DING ELECTRODE TERMINAL adjacent to the grounding bar From the lit kit place the label SUITABLE FOR USE AS SERVICE EQUIPMENT MAIN SERVICE DISCONNECT on the deadfront near the main breaker service disconnect If IQ System Controller 2 is not used as service equipment these labels should not be used E Connect Lines Neutral and Ground For details refer to the conductor table on the unit for sizes and ...

Page 6: ...e service entrance of the the system controller The arrows on the Consump tion PCS CT must point towards the loads towards the busbar inside the IQ System Controller 2 Refer to the image on the next page for the Consumption PCS CT location and wiring to the IQ Gateway D You must protect all PCS controlled busbars and or conductors with suitably rated overcurrent devices that are appropriately size...

Page 7: ...al Back side 20mm vertical x 20mm Horizontal Production CT CT 200 SOLID 9mm vertical x 30mm horizontal This sensor is part of a Power Control System Do not re move or disable Replace with same type and rating NOTE The maximum operating currents in controlled busbars or conductors are limited by the settings of the Power Control System PCS and may be lower than the sum of the currents of the connec...

Page 8: ... is for connecting with a remote RSD switch It has two normal ly close auxiliary contacts NC3 NC4 and each auxiliary contact has two terminals Gen I O has one normally open auxiliary contact NO3 for generator control and this contact has three terminals All the auxiliary contact relays are rated for pilot duty at 24Vac Vdc nomi nal and 1 Amp A Auxiliary Contact connections for shedding excess PV a...

Page 9: ...s to secure the headers to IQ System Controller 2 as shown in Feed through headers for I O 1 and I O 2 image 1 Insert the wires from the transformer controller and the external contactor into the feed through header NOTE Supports AWG 28 to AWG 16 wire sizes 2 Tighten the screws on the top torque 0 22Nm to 0 25Nm to secure the wires Follow same procedure for generator dry contact connections There ...

Page 10: ...of generator CTs CT 200 SPLIT for L1 and L2 at the IQ System Controller 2 s Generator input terminal for power monitoring when the generator is running Detailed CT wiring is described in step 9 G Use Enphase Installer App mobile application to commission and pro gram IQ System Controller 2 to control the generator H For 2 wire autostart generators wire the Generator I O port in IQ System Controlle...

Page 11: ...he arrow on the CT pointing towards the Generator breaker D Clamp the unmarked CT on Line 2 of the generator branch circuit inside the IQ System Controller 2 box with the arrow pointing towards the Generator breaker E Bring the CT lead wires out of IQ System Controller 2 to the standalone IQ Gateway or IQ Gateway in the IQ Combiner box F Use a screwdriver to loosen the screw on the IQ Gateway term...

Page 12: ... to meet warranty requirements the IQ System Controller 2 must be installed and or stored according to the instructions in this guide NOTE The IQ System Controller 2 is compatible only with the IQ Combiner 4 4C fitted with USB hub USB radios and production and Consumption PCS CTs The IQ Combiner with the IQ Gateway inside is required for operation of the IQ System Controller 2 Earlier versions of ...

Reviews: