![Enotec AQUATEC 1000 Installation And Operation Manual Download Page 13](http://html.mh-extra.com/html/enotec/aquatec-1000/aquatec-1000_installation-and-operation-manual_2413830013.webp)
Installation and Operation Manual – AQUATEC 1000
Installation
Doc.-ID: AQUA_16012020_EN
13
2.7
Installation of the probe
The flue gas temperature, pressure and all other process conditions must be in accordance with the specification.
Leave enough space for insertion/removal of the probe and protection tube (if supplied) and ensure access to the
measuring probe and/or connecting box. Before cutting a hole in the flue gas duct, make sure that the inside of the
duct has enough space for probe installation and that no soot is blown out nearby or any obstacles are in the way.
For probe lengths exceeding 2000 mm, a support must be mounted inside the duct (every 2m) to prevent the probe
and mounting tube from flexing or bending.
ENOTEC recommends installing the probe horizontally for the
fastest possible response time.
Maintain the protection class
Avoid vibrations greater 2g
2.8
Mounting of the Probe
The mating flange must be
welded at the specified angle
Process gas flow
The welded seam must be gas-
tight
Adapter (supplied by customer)
Stainless steel adapter with
R2½”-thread
AQUATEC – Probe
Insulation
Figure 9 -
Mounting the
KES 132x with filter head KES-132060AK and adapter plate ASR-1320-KN
Figure 10 -
Mounting of the O
2
probe KES-132x with ASR-1320
1-
3°
1
3
4
5
6
2
7
AQUATEC