4.7.3.3.2
Push the crimped contact into the socket receptacle/plug insulator until
it engages. Pull lightly on the lead to check that the metal part has
engaged.
Figure 5 – Contact insertion.
4.7.3.4
Assembly Control
4.7.3.4.1
Insert the test pin with the corresponding side into the socket or plug to
the end position. If the contact is correctly assembled, the white marking
on the test pin must be still visible. (Figure 4)
4.7.3.4.2
Screw on the cable gland, hand-tight, with the tools PV-MS.
4.7.3.4.3
The tightening torque must be adapted to the solar cables used in each
specific case. Typical values lie in a range between 2,5Nm to 3Nm
4.7.4.
Plugging
4.7.4.1
Mount the plug connection until it engages. Check correct engagement by
pulling on the coupling.
4.7.5.
Unplugging
4.7.5.1.
The plug connection can only be unlocked with the tool PV-MS (Figure 5)
Figure 6 – Unplugging using PV-MS tool.
4.7.6.
Array Wiring
4.7.6.1.
Series