1. OBJECTIVE
The purpose of this procedure is to provide installation instructions for EST SERIES thin film solar
module for field installation.
2. SCOPE
This procedure establishes the key installation requirements to mount EST SERIES thin film solar
modules in the field which includes, but is not excluded to, roof tops, solar farms, and commercial
buildings.
3. RESPONSIBILITY
ENN Solar Energy Co. Ltd.
shall maintain the engineering change control of this product.
End installer of the thin film Photovoltaic (PV) modules is responsible for the design and
integrity of the mounting structure of the modules. The PV module manufacturer is responsible
for the design and structural integrity of the PV modules. Installation of the PV modules must be
performed by appropriately trained and equipped installers.
Supplier is responsible for maintaining and supporting the bill of materials on the Supplier database.
4. INSTALLATION
4.1.
Unpacking and handling
The site and personnel must obtain the proper handling and transport equipment to install the PV
modules.
4.2. Personnel
Only trained personnel are to handle, transport, and install the PV modules. Immediate exposures
to sunlight instantly energize the modules and pose a shock risk.
4.3. Safety
It is the responsibility of the supplier to provide adequate safety to its employees while
performing the procedures.
Under normal conditions, a photovoltaic module may experience conditions that produce more
current and/or voltage than reported at Standard Test Conditions. Accordingly, the values of Isc
and Voc marked this module should be multiplied by the following factors: The multiplying
factors at conditions of an irradiance of 125 mW/cm^2, AM 1.5 spectrum is 1.19, and at a cell
temperature of minus 10 deg C for Voc is 0.895 and at plus 75 deg C for Isc is 1.05.